Cavity stability and bearing capacity of spudcan foundations on clay

MS Hossain, MF Randolph, Y Hu… - Offshore Technology …, 2006 - onepetro.org
Offshore Technology Conference, 2006onepetro.org
The paper describes centrifuge modelling and finite element (FE) analysis of the penetration
of spudcan foundations in clay, identifying soil flow mechanisms around the spudcan, the
extent of any cavity above the spudcan and the evolving penetration resistance. Particle
image velocimetry allowed accurate resolution of the flow pattern around a'half-
spudcan'penetrated adjacent to a transparent window. Separate tests on full spudcans
quantified the penetration resistance relative to strengths obtained from T-bar penetrometer …
Abstract
The paper describes centrifuge modelling and finite element (FE) analysis of the penetration of spudcan foundations in clay, identifying soil flow mechanisms around the spudcan, the extent of any cavity above the spudcan and the evolving penetration resistance. Particle image velocimetry allowed accurate resolution of the flow pattern around a 'half-spudcan' penetrated adjacent to a transparent window. Separate tests on full spudcans quantified the penetration resistance relative to strengths obtained from T-bar penetrometer tests. All results were validated using conventional FE analysis of spudcans pre-embedded at various depths, and large deformation FE analysis where the spudcan was penetrated from the seabed surface. The study has shown that the present SNAME guidelines for predicting the point of 'back-flow' of soil above spudcans are incorrect, based on the wrong mechanism. Backflow occurs not because of instability of the open cavity, but because of a preferential flow mechanism of soil from below the spudcan to above it. The paper provides new guidelines rom which the penetration resistance and cavity depth can be computed accurately, based on the new penetration mechanisms presented.
Introduction
Mobile jack-up rigs are used widely in the offshore oil and gas industry for installing new platforms, maintenance work and drilling and even for production for fields of limited life. There has been continual development of rig operations into new regions and greater water depths, with larger jack-ups now capable of operation in depths of up to 120 m. A typical modern jack-up unit comprises a buoyant triangular platform supported by three independent K-lattice legs, each resting on a large inverted conical footing known as a spudcan (Young et al., 1984). Spudcans are typically circular or polygonal in plan, with a shallow conical underside and a central spigot to provide improved sliding resistance, as illustrated schematically in Figure 1. With the move towards heavier rigs and deeper waters, assessment of the performance and safety of jack-up rigs has become increasingly important. A critical aspect of this is the penetration resistance, and the extent to which a cavity will remain above the spudcan as it penetrates, and the depth at which soil will flow back over the spudcan.
Before the commencement of the jack-up operations, the spudcans are preloaded by pumping seawater into compartments within the hull. The preload causes the spudcans to penetrate into the seabed until the load on the spudcan is equilibrated by the resistance of the underlying soil. In soft soil, a spudcan may penetrate up to 2 or 3 diameters to reach equilibrium (Endley et al., 1981). The purpose of preloading is to penetrate the foundation sufficiently so that its resulting bearing capacity exceeds that required during extreme storm loading by an acceptable margin of safety. The ballast is then emptied and the hull is raised further to provide an adequate air-gap for subsequent operation.