Reconfigurable manufacturing systems: the state of the art

ZM Bi, SYT Lang, W Shen, L Wang - International journal of …, 2008 - Taylor & Francis
In this paper, general requirements of next generation manufacturing systems are
discussed, and the strategies to meet these requirements are considered. The production …

Development of reconfigurable machines

ZM Bi, SYT Lang, M Verner, P Orban - The International Journal of …, 2008 - Springer
This paper summarizes our survey on the development of reconfigurable machines (RMs).
The goals of this survey were to (i) clarify the needs and drivers to develop the RMs,(ii) …

A market-based multi-agent system model for decentralized multi-project scheduling

G Confessore, S Giordani, S Rismondo - Annals of Operations Research, 2007 - Springer
We consider a multi-project scheduling problem, where each project is composed of a set of
activities, with precedence relations, requiring specific amounts of local and shared (among …

Smart cyber-physical manufacturing: Extended and real-time optimization of logistics resources in matrix production

Á Bányai, B Illés, E Glistau, NIC Machado, P Tamás… - Applied Sciences, 2019 - mdpi.com
In the context of Industry 4.0, the matrix production concept represents revolutionary
solutions from a technological and logistics point of view. In a matrix production system …

The future trend on system-wide modelling in supply chain studies

FTS Chan, HK Chan - The International Journal of Advanced …, 2005 - Springer
Although supply chain (SC) has gained increasing attention in the last decade and
numerous SC problems have been identified and solved, there is a lack of systematic …

A new multi-agent system framework for tacit knowledge management in manufacturing supply chains

K Al-Mutawah, V Lee, Y Cheung - Journal of Intelligent Manufacturing, 2009 - Springer
Participating members in a manufacturing supply chain (MSC) usually make use of
individual knowledge for making independent decisions. Recent research, however …

Toolpath allocation and scheduling for concurrent fused filament fabrication with multiple extruders

Y Jin, HA Pierson, H Liao - IISE Transactions, 2019 - Taylor & Francis
Fused filament fabrication, like most layer-wise additive manufacturing processes, is
hindered by low production rates and scalability issues. Concurrent fused filament …

Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem

P Anussornnitisarn, SY Nof, O Etzion - International Journal of Production …, 2005 - Elsevier
This paper focuses on the decision-making mechanism of coordination protocol for a multi-
agent system in collaborative, distributed environment requiring resource allocation …

A new model for manufacturing supply chain networks: a multiagent approach

FTS Chan, HK Chan - Proceedings of the Institution of …, 2004 - journals.sagepub.com
Participating members in a manufacturing supply chain usually make use of an information
system like enterprise resources planning (ERP) for planning and scheduling activities …

Aligning the operations of barges and terminals through distributed planning

AM Douma - 2008 - research.utwente.nl
In this thesis we consider the barge handling problem, which is about the alignment of barge
and terminal operations in a port. Complicating factor in tackling this problem is that …