Core, shapley value, nucleolus and nash bargaining solution: A Survey of recent developments and applications in operations management
C Luo, X Zhou, B Lev - Omega, 2022 - Elsevier
The core, Shapley value, nucleolus and Nash bargaining solution are the most widely used
solution concepts in cooperative game theory. This paper surveys the literature on recent …
solution concepts in cooperative game theory. This paper surveys the literature on recent …
Scheduling in Industrial environment toward future: insights from Jean-Marie Proth
According to [Dolgui, Alexandre, and Jean Marie Proth. 2010. Supply Chain Engineering:
Useful Methods and Techniques. Vol. 539. Springer.], advancing tactical levels in production …
Useful Methods and Techniques. Vol. 539. Springer.], advancing tactical levels in production …
Multiobjective flexible job-shop rescheduling with new job insertion and machine preventive maintenance
Y An, X Chen, K Gao, Y Li… - IEEE Transactions on …, 2022 - ieeexplore.ieee.org
In the actual production, the insertion of new job and machine preventive maintenance (PM)
are very common phenomena. Under these situations, a flexible job-shop rescheduling …
are very common phenomena. Under these situations, a flexible job-shop rescheduling …
Adaptive job shop scheduling strategy based on weighted Q-learning algorithm
YF Wang - Journal of Intelligent Manufacturing, 2020 - Springer
Given the dynamic and uncertain production environment of job shops, a scheduling
strategy with adaptive features must be developed to fit variational production factors …
strategy with adaptive features must be developed to fit variational production factors …
A cooperative approach to service booking and scheduling in cloud manufacturing
Cloud manufacturing (CMfg) can make mass manufacturing resources more widely
accessible to clients in the form of manufacturing services with their available time slots and …
accessible to clients in the form of manufacturing services with their available time slots and …
Rescheduling with New Orders Under Bounded Disruption
Rescheduling problems arise when unpredicted events occur, such as the arrival of new
orders. These new jobs should be integrated in a proper way in the existing schedule of the …
orders. These new jobs should be integrated in a proper way in the existing schedule of the …
Profit allocation in collaborative bioenergy and biofuel supply chains
In this paper, the profit allocation problem, which was overlooked in the collaborative
bioenergy and biofuel supply chain literature, is considered. The optimization model for the …
bioenergy and biofuel supply chain literature, is considered. The optimization model for the …
Rescheduling due to machine disruption to minimize the total weighted completion time
We investigate a single machine rescheduling problem that arises from an unexpected
machine unavailability, after the given set of jobs has already been scheduled to minimize …
machine unavailability, after the given set of jobs has already been scheduled to minimize …
Single machine rescheduling for new orders: properties and complexity results
Rescheduling problems arise in a variety of situations where a previously planned schedule
needs to be adjusted to deal with unforeseen events. A common problem is the arrival of …
needs to be adjusted to deal with unforeseen events. A common problem is the arrival of …