[HTML][HTML] Contaminant containment for sustainable remediation of persistent contaminants in soil and groundwater

LP Padhye, P Srivastava, T Jasemizad, S Bolan… - Journal of Hazardous …, 2023 - Elsevier
Contaminant containment measures are often necessary to prevent or minimize offsite
movement of contaminated materials for disposal or other purposes when they can be …

Vertical barriers for land contamination containment: a review

B Cao, J Xu, F Wang, Y Zhang, D O'Connor - International journal of …, 2021 - mdpi.com
Soil pollution is one of the major threats to the environment and jeopardizes the provision of
key soil ecosystem services. Vertical barriers, including slurry trench walls and walls …

[HTML][HTML] Numerical analysis of consolidation behavior of soil-bentonite backfill in a full-scale slurry trench cutoff wall test

S Tong, LL Wei, JC Evans, YM Chen, YC Li - Soils and Foundations, 2022 - Elsevier
The stress state of the SB backfill in a full-scale cutoff wall test during the construction and
consolidation was simulated by a finite-element model. The applicability of the model was …

Hydro-mechanical behaviour of a cement–bentonite mixture along evaporation and water-uptake controlled paths

G Musso, VS Vespo, G Guida… - Geomechanics for Energy …, 2023 - Elsevier
The results of a laboratory investigation on the effects of drying and wetting on the hydro-
mechanical behaviour of a cement–bentonite mixture are presented. A large hysteresis …

Quantitative identification of cutoff wall construction defects using Bayesian approach based on excess pore water pressure

M Wu, G Cai, L Liu, Z Jiang, C Wang, Z Sun - Acta Geotechnica, 2022 - Springer
Cutoff wall has been widely used as a barrier to prevent the migration of contaminants in
aquifers. Hydraulic impermeability and homogeneity should be ensured before operation …

Comparison of laboratory and field measurements of backfill hydraulic conductivity for a large-scale soil-bentonite cutoff wall

MA Malusis, LC Barlow - Journal of Geotechnical and …, 2020 - ascelibrary.org
Soil-bentonite (SB) cutoff walls are commonly employed to control groundwater flow and
contaminant migration, and the hydraulic conductivity (k) of the SB backfill is a critical …

Interception behaviors of mixed chlorinated hydrocarbons in groundwater by DDAC-amended LPBs: Control mechanism and CFD simulation

Y Wang, C Wang, S Guo, C Wang, J Wang… - Journal of Hazardous …, 2024 - Elsevier
Low permeability barrier has emerged as a promising, cost-effective technology for anti-
seepage and pollution mitigation in geotechnical engineering. However, its efficacy in …

In situ stress states and lateral deformations of soil–bentonite cutoff walls during consolidation process

X Tong, YC Li, H Ke, Y Li, Q Pan - Canadian Geotechnical …, 2020 - cdnsciencepub.com
A long-term in situ test was performed on two soil–bentonite (SB) cutoff walls with different
dimensions. The total stresses and pore pressures in the walls were monitored for 8 months …

Development of a trench cutting re-mixing deep wall method model test device

P Jiang, Q Zhang, R Liu, A Bezuijen, Y Liu… - … and Underground Space …, 2020 - Elsevier
The trench cutting re-mixing deep wall (TRD) is a new type of underground waterproof
curtain. Mixing uniformity is the key index affecting the efficiency and quality of this method …

Design and evaluation of IoT-Enabled instrumentation for a soil-bentonite slurry trench cutoff wall

A Marchiori, Y Li, J Evans - Infrastructures, 2019 - mdpi.com
In this work, we describe our approach and experiences bringing an instrumented soil-
bentonite slurry trench cutoff wall into a modern IoT data collection and visualization …