A review of cut-off grade policy models for open pit mining operations
MWA Asad, MA Qureshi, H Jang - Resources Policy, 2016 - Elsevier
In an open pit mining operation, the heterogeneity of the grade-tonnage distribution of the
deposit dictates that all available material within the boundaries of an open pit may not be …
deposit dictates that all available material within the boundaries of an open pit may not be …
Laboratory analyses of Kaolinite stabilized by vinyl polymers with different monomer types
H Ghasemzadeh, A Mehrpajouh, M Pishvaei - Engineering Geology, 2021 - Elsevier
The geotechnical behavior of a mixture of kaolinite and vinyl polymers with different
monomer types was investigated using a series of laboratory tests. Three polymers were …
monomer types was investigated using a series of laboratory tests. Three polymers were …
A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects
E Rahimi, H Ghasemzadeh - Resources Policy, 2015 - Elsevier
Optimum cut-off grades with different types of objective functions are determined by
optimization algorithms which recognized as the one of the basis of sustainable …
optimization algorithms which recognized as the one of the basis of sustainable …
Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit
An integral connection exists among the mine production planning, the mined material
destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation …
destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation …
Application of meta-heuristic optimization algorithm to determine the optimal cutoff grade of open pit mines
MR Ahmadi, AA Bazzazi - Arabian Journal of Geosciences, 2020 - Springer
The optimal cutoff grade leads to maximizing the profit or the net present value (NPV). One
of the most important issues in open pit mining is cutoff grade optimization with regard to …
of the most important issues in open pit mining is cutoff grade optimization with regard to …
Effect of the glass transition temperature of acrylic polymers on physical and mechanical properties of kaolinite clay and sandy soil
A Mehrpajouh, H Ghasemzadeh… - Journal of Materials in …, 2021 - ascelibrary.org
The physical and mechanical behavior of soil polymer composites tightly depends on the
properties and structures of both soil and polymer. This study aims to investigate the effect of …
properties and structures of both soil and polymer. This study aims to investigate the effect of …
Application of KKT in determining the final destination of mined material in multi-processing mines
Determining the final destination of mined materials is counted as one of the most important
challenges in mining. Cut-off grade is a criterion specifying the destination of mined …
challenges in mining. Cut-off grade is a criterion specifying the destination of mined …
Effect of copper slag recovery on hydrometallurgical cut-off grades considering environmental aspects
Determining the hydrometallurgical cut-off grades specifies the destination of low grade
materials and this is subjected to more benefits in mining. Copper production rate is …
materials and this is subjected to more benefits in mining. Copper production rate is …
Cut-off Grade Optimization in Open-pit Mines Considering Two Processing Streams and Rehabilitation Cost
D Kalitenge - 2021 - era.library.ualberta.ca
Cut-off grade is one of the important aspects of mining engineering. It distinguishes which
material is worth mining and processing or stockpiling and which one should be left or …
material is worth mining and processing or stockpiling and which one should be left or …
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
MA Qureshi - 2017 - espace.curtin.edu.au
This study presents a new mathematical model for cut-off grade and production scheduling
optimisation in open pit mining operations. The model maximises the net present value of …
optimisation in open pit mining operations. The model maximises the net present value of …