Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction

Y Yuan, S Ye, L Lin, M Gen - Computers & Industrial Engineering, 2021 - Elsevier
Different from traditional project management, the prefabricated building (PB) construction
project has a complex distributed supply chain model, and the overall project is completed …

Survey of quantitative methods in construction

D Briskorn, M Dienstknecht - Computers & Operations Research, 2018 - Elsevier
Quantitative methods and techniques from operations research (OR) are well-accepted in
many industries, eg the manufacturing industry or the transportation industry. Similarly …

Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem

S Aminbakhsh, R Sonmez - Expert Systems with Applications, 2016 - Elsevier
Despite many research studies have concentrated on designing heuristic and meta-heuristic
methods for the discrete time–cost trade-off problem (DTCTP), very little success has been …

Optimizing time and cost simultaneously in projects with multi-verse optimizer

PVH Son, NT Nguyen Dang - Asian Journal of Civil Engineering, 2023 - Springer
Balancing time and cost has long been a primary focus of construction project management.
In this context, achieving optimal balancing time and cost objectives is crucial. The multi …

Development path of construction industry internet platform: An AHP–TOPSIS integrated approach

K Li, T Duan, Z Li, X Xiahou, N Zeng, Q Li - Buildings, 2022 - mdpi.com
The Internet-based platform in the construction industry is a carrier for integrated
construction information, which positively contributes to the development of smart …

[HTML][HTML] Delayed dynamic step shuffling frog-leaping algorithm for optimal design of photovoltaic models

Y Fan, P Wang, AA Heidari, X Zhao, H Turabieh… - Energy Reports, 2021 - Elsevier
Developing an accurate mathematical model is an essential tool for studying and optimizing
the performance of the photovoltaic cell system (PV). Transforming the PV problem into an …

Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods

DH Tran - Engineering, Construction and Architectural …, 2020 - emerald.com
Purpose Project managers work to ensure successful project completion within the shortest
period and at the lowest cost. One of the main tasks of a project manager in the planning …

Overview of multi-objective optimization approaches in construction project management

I Alothaimeen, D Arditi - Multicriteria optimization-Pareto …, 2019 - books.google.com
The difficulties that are met in construction projects include budget issues, contractual time
constraints, complying with sustainability rating systems, meeting local building codes, and …

Pareto front particle swarm optimizer for discrete time-cost trade-off problem

S Aminbakhsh, R Sonmez - Journal of Computing in Civil …, 2017 - ascelibrary.org
Intensive heuristic and metaheuristic research efforts have focused on the Pareto front
optimization of discrete time-cost trade-off problem (DTCTP). However, very little success …

Stackelberg game optimization for integrated production-distribution-construction system in construction supply chain

C Feng, Y Ma, G Zhou, T Ni - Knowledge-Based Systems, 2018 - Elsevier
Although construction supply chain management has attracted significant research attention,
this field remains somewhat fragmented. This paper examines an integrated production …