Simulation-based methods for float time determination and schedule optimization for construction projects

G Dori - 2016 - mediatum.ub.tum.de
1.1 Executive summary Every construction site is unique. Even if identical buildings are built,
the surrounding conditions (eg the ground material, traffic, already existing buildings, site …

Optimal management of two-stage stochastic production systems

MK Prilutskii - Automation and Remote Control, 2018 - Springer
We consider the optimal control problem for a certain class of production systems operating
under uncertainty. We construct a mathematical model, give the settings of optimization …

Programmed control of two-stage stochastic production systems

MK Prilutskii - Automation and Remote Control, 2020 - Springer
The programmed control problem for a certain class of production systems operating under
uncertainty is considered. A mathematical model is constructed; an optimization problem of …

Оптимальное управление двухстадийными стохастическими производственными системами

МХ Прилуцкий - Автоматика и телемеханика, 2018 - mathnet.ru
Рассматривается проблема оптимального управления некоторым классом
производственных систем, функционирующих в условиях неопределенности. Строится …

Программные управления двухстадийными стохастическими производственными системами

МХ Прилуцкий - Автоматика и телемеханика, 2020 - mathnet.ru
Рассматривается проблема программного управления некоторым классом
производственных систем, функционирующих в условиях неопределенности. Строится …

Simulation Based Construction Project Schedule Optimization: An Overview on the State-of-the-Art

M Bügler, A Borrmann - Handbook of Research on Computational …, 2016 - igi-global.com
Construction projects require a multitude of procedures and resources for the high diversity
of building concepts. Most of such projects are unique in their design and need individual …

[引用][C] Reactive Simulation of Shoring and Excavation Processes based on Discrete-Event Simulation and Automated Performance Monitoring