Integration of cost and work breakdown structures in the management of construction projects

A Cerezo-Narváez, A Pastor-Fernández… - Applied sciences, 2020 - mdpi.com
Scope management allows project managers to react when a project underperforms
regarding schedule, budget, and/or quality at the execution stage. Scope management can …

Towards automated progress assessment of workpackage components in construction projects using computer vision

YM Ibrahim, TC Lukins, X Zhang, E Trucco… - Advanced Engineering …, 2009 - Elsevier
Traditional methods of collecting data on the progress of construction projects often involve
human judgement, high costs, and are too infrequent to provide managers with timely and …

Automating progress measurement of construction projects

X Zhang, N Bakis, TC Lukins, YM Ibrahim, S Wu… - Automation in …, 2009 - Elsevier
The accurate and up to date measurement of work in progress on construction sites is vital
for project management functions like schedule and cost control. Currently, it takes place …

Quantitative similarity assessment of construction projects using WBS-based metrics

N Torkanfar, ER Azar - Advanced Engineering Informatics, 2020 - Elsevier
Lessons learned from completed projects are valuable resources for planning of new
projects. A quantitative similarity measurement between construction projects can improve …

Framework for a generic work breakdown structure for building projects

Y Makarfi Ibrahim, A Kaka, G Aouad… - Construction …, 2009 - emerald.com
Purpose–The purpose of this paper is to propose a framework for the standardisation of the
work breakdown structure (WBS) for building projects. This is based on the premise that …

[PDF][PDF] Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of flyover works

M Pratita, Y Latif - Proceedings of the International Conference on …, 2018 - ieomsociety.org
Abstract Work Breakdown Structure (WBS) is a breakdown of project works into smaller
components so it can be better managed. It is also known that the quality of project works is …

Estimating correspondence between arbitrarily selected points in two widely-separated views

P Podbreznik, B Potočnik - Advanced Engineering Informatics, 2010 - Elsevier
When monitoring events on a building site using a system of multiple cameras, it is
necessary to establish correspondences between the acquired imaging material. The basic …

A study on the practical utilization analysis and linkage scheme of WBS and OBS from the construction manager (CMr) perspective

J Yang, B Seo, S Lee - Korean Journal of Construction Engineering …, 2020 - koreascience.kr
Construction management performs a variety of tasks, and the buildup of the WBS and OBS
is one of the core tasks. However, the practical utilization of WBS and OBS is low in the …

A conceptual model for transformation of bill of materials from offsite manufacturing to onsite construction in industrialized house-building

R Hussamadin, M Viklund Tallgren… - … on Automation and …, 2020 - diva-portal.org
Lending inspiration from the manufacturing industry, industrialized house-builders have
adopted some of its characteristics such as high standardization of configurable products …

On the measurement of work in progress using computer vision: A computerised reporting model

Y Makarfi Ibrahim - Journal of Engineering, Design and Technology, 2010 - emerald.com
Purpose–The desire to improve efficiency has led both academics and practitioners to
embrace various technologies to aid managers to discharge their functions. Recently, there …