Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group

AA Hijazi, S Perera, RN Calheiros… - Journal of construction …, 2021 - ascelibrary.org
Building information modeling (BIM) plays a critical role in the integration of different parties
by acting as a centralized database defining their responsibilities and contractual …

Barriers and impact of mechanisation and automation in construction to achieve better quality products

SS Kamaruddin, MF Mohammad, R Mahbub - Procedia-Social and …, 2016 - Elsevier
The major concern to the construction industry in general, would be the decreasing quality
and productivity of end products; labour shortages; occupational health and safety; and …

Evaluating supplier management maturity in prefabricated construction project-survey analysis in China

K Liu, Y Su, S Zhang - Sustainability, 2018 - mdpi.com
Prefabrication is considered as a modern method of construction, transferring part of on-site
work into factories and generating a new decoupling point in supply chain. Management of …

Identifying and evaluating critical success factors for industrialized building systems implementation: Malaysia study

KMA El-Abidi, G Ofori, SAS Zakaria… - Arabian Journal for …, 2019 - Springer
The drive toward implementing an industrialized building system (IBS) in Malaysia is in line
with Malaysia's Construction Industry Transformation Plan 2016–2020, which seeks to …

Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia

MAM Fateh, MF Mohammad… - MATEC Web of …, 2017 - matec-conferences.org
Industrialised Building System (IBS) is the common term used to represent the prefabrication
concept in Malaysia. Based on previous research being done locally and internationally, it is …

[PDF][PDF] Supply chain integration issues and challenges in industrialised building system (IBS) construction projects in Malaysia

WZW Abdullah, SRM Nasir - Malaysian Construction Research …, 2017 - researchgate.net
Malaysian now is as of now driving for executing an advanced development strategy, the
Industrialised Building System (IBS), as an option towards improving the construction …

Critical success factors for lean thinking in the application of Industrialised Building System (IBS)

R Yunus, SRM Noor, S Nagapan… - IOP Conference …, 2017 - iopscience.iop.org
Productivity in the manufacturing process of building components can be increased by
optimising each advantage that is available in each activity. Identification of critical success …

Towards improving integration of supply chain in IBS construction project environment

AS Abd Shukor, MF Mohammad, R Mahbub… - Procedia-Social and …, 2016 - Elsevier
Although efforts exist to enhance IBS practice in Malaysia, establishing integration between
IBS playersis still a major hindrance. To ensure the success of IBS construction, the research …

The Framework of Factors for the Improvement of the Significant Clauses in the Standard Form of Contract for the IBS Construction Approach in Malaysia

MAM Fateh, MF Mohammad - International Journal of …, 2021 - penerbit.uthm.edu.my
The Industrialised Building System (IBS) was introduced over 10 years ago in Malaysia, with
well-documented benefits and strong support from the government. Apparently, the adoption …

How BIM systems affect maintaining IBS building

ZA Ismail - Facilities, 2021 - emerald.com
Purpose The purpose of this paper is to discuss the system approaches and their application
for managing IBS building in the context of Malaysian maintenance practice. Currently, the …