Factors affecting the price of recycled concrete: A critical review
A significant increase in construction activities has led to the production of massive
construction and demolition (C&D) waste. Recycling is regarded as an ideal approach to …
construction and demolition (C&D) waste. Recycling is regarded as an ideal approach to …
[图书][B] Handbook on scheduling
Scheduling problems can be understood in general as the problems of allocating resources
over time to perform a set of tasks being parts of some processes, among which …
over time to perform a set of tasks being parts of some processes, among which …
Systematic search and mapping review of the concrete delivery problem (CDP): formulations, objectives, and data
A Tzanetos, M Blondin - Automation in Construction, 2023 - Elsevier
Over the last decades, researchers have studied one of the most complex combinatorial
problems, ie, the Concrete Delivery Problem (CDP), set different formulations of it …
problems, ie, the Concrete Delivery Problem (CDP), set different formulations of it …
Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers
Z Liu, Y Zhang, M Yu, X Zhou - Automation in construction, 2017 - Elsevier
In this study, the problem of integration of ready-mixed concrete (RMC) production
scheduling and truck and pump dispatching in an RMC plant with multiple mixers is focused …
scheduling and truck and pump dispatching in an RMC plant with multiple mixers is focused …
Survey of quantitative methods in construction
D Briskorn, M Dienstknecht - Computers & Operations Research, 2018 - Elsevier
Quantitative methods and techniques from operations research (OR) are well-accepted in
many industries, eg the manufacturing industry or the transportation industry. Similarly …
many industries, eg the manufacturing industry or the transportation industry. Similarly …
[PDF][PDF] Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm.
N Mayteekrieangkrai… - … Journal of Science & …, 2015 - thaiscience.info
This research proposes a systematic model by using bee algorithm to optimize ready mixed
concrete truck scheduling problem from a single plant to multiple sized receivers in a large …
concrete truck scheduling problem from a single plant to multiple sized receivers in a large …
Mixed integer programming formulations for the biomass truck scheduling problem
L Torjai, F Kruzslicz - Central European Journal of Operations Research, 2016 - Springer
In this paper, we introduce the Biomass Truck Scheduling (BTS) problem that originated in a
real-life herbaceous biomass supply chain (HBSC) around Pécs, Hungary. BTS can be …
real-life herbaceous biomass supply chain (HBSC) around Pécs, Hungary. BTS can be …
Model formulation and calibration procedure for integrated multi-modal activity routing and network assignment models
In this paper, a novel transport planning model system (TPMS) is formulated built on the
concepts of network, multi-modality, integrity and instant calibration. In the proposed …
concepts of network, multi-modality, integrity and instant calibration. In the proposed …
Matching experts' decisions in concrete delivery dispatching centers by ensemble learning algorithms: Tactical level
Abstract Ready Mixed Concrete (RMC) suffers from a lack of practical solutions for automatic
resource allocation. Under these circumstances, RMC dispatching systems are mostly …
resource allocation. Under these circumstances, RMC dispatching systems are mostly …
Integration of ridesharing and activity travel pattern generation
This paper proposes a mobility system serving as an innovative platform that synchronises a
ridesharing model and an Activity Travel Pattern (ATP) generator, enabling a synergistic …
ridesharing model and an Activity Travel Pattern (ATP) generator, enabling a synergistic …