Scheduling and lot sizing with sequence-dependent setup: A literature review
X Zhu, WE Wilhelm - IIE transactions, 2006 - Taylor & Francis
This paper reviews the literature related to the class of scheduling problems that involve
sequence-dependent setup times (costs), an important consideration in many practical …
sequence-dependent setup times (costs), an important consideration in many practical …
Structural properties and algorithms for earliness and tardiness scheduling against common due dates and windows: A review
This paper deals with earliness and tardiness scheduling around common due dates and
windows. Related problems share a strong practical importance due to the endogenous and …
windows. Related problems share a strong practical importance due to the endogenous and …
A survey of scheduling problems with setup times or costs
The first comprehensive survey paper on scheduling problems with separate setup times or
costs was conducted by [Allahverdi, A., Gupta, JND, Aldowaisan, T., 1999. A review of …
costs was conducted by [Allahverdi, A., Gupta, JND, Aldowaisan, T., 1999. A review of …
Intelligent scheduling of a feature-process-machine tool supernetwork based on digital twin workshop
Modern manufacturing enterprises are shifting toward multi-variety and small-batch
production. By optimizing scheduling, both transit and waiting times within the production …
production. By optimizing scheduling, both transit and waiting times within the production …
Heuristics for the unrelated parallel machine scheduling problem with setup times
G Rabadi, RJ Moraga, A Al-Salem - Journal of Intelligent Manufacturing, 2006 - Springer
The problem addressed in this paper is the non-preemptive unrelated parallel machine
scheduling problem with the objective of minimizing the makespan. Machine-dependent and …
scheduling problem with the objective of minimizing the makespan. Machine-dependent and …
Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
PL Rocha, MG Ravetti, GR Mateus… - Computers & Operations …, 2008 - Elsevier
A scheduling problem with unrelated parallel machines, sequence and machine-dependent
setup times, due dates and weighted jobs is considered in this work. A branch-and-bound …
setup times, due dates and weighted jobs is considered in this work. A branch-and-bound …
An efficient two-stage optimization algorithm for a flexible job shop scheduling problem with worker shift arrangement
H Li, J Peng, X Wang - Computers & Operations Research, 2024 - Elsevier
Due to the involvement of workers, scheduling production jobs necessitates consideration of
worker shifts in most production activities. In this study, we address a flexible job shop …
worker shifts in most production activities. In this study, we address a flexible job shop …
[PDF][PDF] Online planning for collaborative search and rescue by heterogeneous robot teams
Collaboration is essential for effective performance by groups of robots in disaster response
settings. Here we are particularly interested in heterogeneous robots that collaborate in …
settings. Here we are particularly interested in heterogeneous robots that collaborate in …
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
S Hatami, S Ebrahimnejad… - The international journal …, 2010 - Springer
In this paper, we consider a three-stage assembly flowshop scheduling problem with bi-
objectives, namely the mean flow time and maximum tardiness. This problem can be …
objectives, namely the mean flow time and maximum tardiness. This problem can be …
Collaborative online planning for automated victim search in disaster response
Collaboration is essential for effective performance by groups of robots in disaster response
settings. Here we are particularly interested in heterogeneous robots that collaborate in …
settings. Here we are particularly interested in heterogeneous robots that collaborate in …