[HTML][HTML] An updated survey of variants and extensions of the resource-constrained project scheduling problem

S Hartmann, D Briskorn - European Journal of operational research, 2022 - Elsevier
The resource-constrained project scheduling problem is to schedule activities subject to
precedence and resource constraints such that the makespan is minimized. It has become a …

A scientometric review of construction progress monitoring studies

T Patel, BHW Guo, Y Zou - Engineering, Construction and …, 2022 - emerald.com
Purpose This article aims to explore valuable insights into the construction progress
monitoring (CPM) research domain, which include main research topics, knowledge gaps …

Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning

RK Soman, M Molina-Solana - Automation in Construction, 2022 - Elsevier
Look-ahead planning is the stage in construction planning where information from diverse
sources is integrated and plans developed for the next six/eight weeks. Poor planning of …

A hybrid genetic algorithm for the discrete time–cost trade-off problem

R Sonmez, ÖH Bettemir - Expert Systems with Applications, 2012 - Elsevier
In this paper we present a hybrid strategy developed using genetic algorithms (GAs),
simulated annealing (SA), and quantum simulated annealing techniques (QSA) for the …

Estimation of environmental emissions and impacts of building construction–A decision making tool for contractors

M Sandanayake, G Zhang, S Setunge - Journal of building engineering, 2019 - Elsevier
Building construction sites are responsible for significant energy consumption and emission
production. The emissions at building construction stage vary from greenhouse gases …

A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project

S Mungle, L Benyoucef, YJ Son, MK Tiwari - Engineering Applications of …, 2013 - Elsevier
Recently government agencies have started to utilize innovative contracting methods that
provide incentives for improving construction quality. These emerging contracting methods …

Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling

M Rogalska, W Bożejko, Z Hejducki - Automation in Construction, 2008 - Elsevier
This paper deals with construction project scheduling. In the literature on the subject one
can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance …

Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects

MA Eirgash, V Toğan, T Dede, HB Başağa - Structures, 2023 - Elsevier
This study proposes an improved version of teaching learning-based optimization (TLBO)
with a modified dynamic-opposition learning (MDOL) strategy, called modified dynamic …

[HTML][HTML] Dynamic networks for resilience-driven management of infrastructure projects

A Gondia, M Ezzeldin, W El-Dakhakhni - Automation in Construction, 2022 - Elsevier
The importance of ensuring the resilience (rapid adaptation to and recovery from
disruptions) of infrastructure projects in modern societies can be hardly overstated …

Effect of stakeholder's conflicts on project constraints: a tale of the construction industry

M Irfan, MJ Thaheem, HF Gabriel, MSA Malik… - International Journal of …, 2019 - emerald.com
Purpose The purpose of this research is to quantify the effect of stakeholder conflicts on
project constraints in the construction industry using ordinal regression analysis. For this …