A column generation-based exact solution method for seru scheduling problems
This paper attempts to address production scheduling problems in seru production systems
(SPS), which is a new-type manufacturing system emanating from Japanese electronic …
(SPS), which is a new-type manufacturing system emanating from Japanese electronic …
An extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problem
Lot sizing and cutting stock problems generally arise in manufacturing as a two stage
connected process. Although these two problems have been addressed separately by many …
connected process. Although these two problems have been addressed separately by many …
An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints
M Rohaninejad, B Vahedi-Nouri… - … Journal of Production …, 2024 - Taylor & Francis
Nowadays, achieving higher levels of flexibility in manufacturing systems is necessary to
maintain and enhance competitiveness. Accordingly, a new generation of production …
maintain and enhance competitiveness. Accordingly, a new generation of production …
Integrated planning for planting and harvesting sugarcane and energy-cane for the production of sucrose and energy
SC Poltroniere, A Aliano Filho, AS Caversan… - … and Electronics in …, 2021 - Elsevier
The main products obtained from sugarcane for the global market are sugar, ethanol and
energy. Although the demand for these products is high, in Brazil there is no longer space to …
energy. Although the demand for these products is high, in Brazil there is no longer space to …
One-dimensional multi-period cutting stock problems in the concrete industry
CA Signorini, SA de Araujo… - International Journal of …, 2022 - Taylor & Francis
This research looks at the production planning of hollow-core slabs integrated to the
optimisation problem of the use of moulds. Considering the production process of these …
optimisation problem of the use of moulds. Considering the production process of these …
The integrated lot sizing and cutting stock problem in an automotive spring factory
PR de Lara Andrade, SA de Araujo, AC Cherri… - Applied Mathematical …, 2021 - Elsevier
In this paper, a manufacturer of automotive springs is studied in order to reduce inventory
costs and losses in the steel bar cutting process. For that, a mathematical model is proposed …
costs and losses in the steel bar cutting process. For that, a mathematical model is proposed …
Modeling and solving a real-world cutting stock problem in the marble industry via mathematical programming and stochastic diffusion search approaches
A Baykasoğlu, BK Özbel - Computers & Operations Research, 2021 - Elsevier
In this study, one-dimensional marble plane cutting problem is studied based on the cutting
equipment productivity and effective use of marble blocks. Different types of marble planes …
equipment productivity and effective use of marble blocks. Different types of marble planes …
New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups
In this paper, we propose new integer optimization models for the lot-sizing and scheduling
problem with sequence-dependent setups, based on the general lot-sizing and scheduling …
problem with sequence-dependent setups, based on the general lot-sizing and scheduling …
Multi-stage scenario-based stochastic programming for managing lot sizing and workforce scheduling at Vestel
This study proposes a multi-stage stochastic production planning approach for a joint lot
sizing and workforce scheduling problem under demand uncertainty. Scenario trees are …
sizing and workforce scheduling problem under demand uncertainty. Scenario trees are …
One-dimensional bin packing with pattern-dependent processing time
F Marinelli, A Pizzuti, W Wu, M Yagiura - European Journal of Operational …, 2024 - Elsevier
In this paper the classical one-dimensional bin packing problem is integrated with
scheduling elements: a due date is assigned to each item and the time required to process …
scheduling elements: a due date is assigned to each item and the time required to process …