The hybrid flow shop scheduling problem

R Ruiz, JA Vázquez-Rodríguez - European journal of operational research, 2010 - Elsevier
The scheduling of flow shops with multiple parallel machines per stage, usually referred to
as the hybrid flow shop (HFS), is a complex combinatorial problem encountered in many …

Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective

I Ribas, R Leisten, JM Framiñan - Computers & Operations Research, 2010 - Elsevier
In this paper, an extensive review of recently published papers on hybrid flow shop (HFS)
scheduling problems is presented. The papers are classified first according to the HFS …

Hybrid flow shop scheduling considering machine electricity consumption cost

H Luo, B Du, GQ Huang, H Chen, X Li - International journal of production …, 2013 - Elsevier
Hybrid flow shop (HFS) scheduling has been extensively examined and the main objective
has been to improve production efficiency. However, limited attention has been paid to the …

A survey of scheduling problems with setup times or costs

A Allahverdi, CT Ng, TCE Cheng… - European journal of …, 2008 - Elsevier
The first comprehensive survey paper on scheduling problems with separate setup times or
costs was conducted by [Allahverdi, A., Gupta, JND, Aldowaisan, T., 1999. A review of …

A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility

R Ruiz, C Maroto - European journal of operational research, 2006 - Elsevier
After 50 years of research in the field of flowshop scheduling problems the scientific
community still observes a noticeable gap between the theory and the practice of …

A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal

L Chen, N Bostel, P Dejax, J Cai, L Xi - European Journal of Operational …, 2007 - Elsevier
The scheduling problem in a container terminal is characterized by the coordination of
different types of equipment. In this paper, we present an integrated model to schedule the …

Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times

QK Pan, L Gao, XY Li, KZ Gao - Applied Mathematics and Computation, 2017 - Elsevier
This paper proposes a total of nine algorithms to minimize the makespan for the hybrid
flowshop scheduling problem with sequence-dependent setup times. The first six algorithms …

Scheduling and lot sizing with sequence-dependent setup: A literature review

X Zhu, WE Wilhelm - IIE transactions, 2006 - Taylor & Francis
This paper reviews the literature related to the class of scheduling problems that involve
sequence-dependent setup times (costs), an important consideration in many practical …

An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times

M Zandieh, SMTF Ghomi, SMM Husseini - Applied Mathematics and …, 2006 - Elsevier
Much of the research on operations scheduling problems has either ignored setup times or
assumed that setup times on each machine are independent of the job sequence. This …

Scheduling flexible flow lines with sequence-dependent setup times

ME Kurz, RG Askin - European Journal of Operational Research, 2004 - Elsevier
This paper examines scheduling in flexible flow lines with sequence-dependent setup times
to minimize makespan. This type of manufacturing environment is found in industries such …