Response analysis and effect evaluation of dynamic stabilization for ballasted track

Z Zhang, H Xiao, Y Wang, Y Chi… - Construction and Building …, 2023 - Elsevier
Dynamic stabilization is a process of the railway lines that are newly built must go through
before it is put into operation. This study investigates the characteristics of stabilizing …

Effect of ballast pockets and geogrid reinforcement on ballasted track: Numerical analysis

W Chen, Y Zhang, C Wang, Y Xiao, P Lou - Transportation Geotechnics, 2023 - Elsevier
The presence of ballast pockets in ballast track on soil subgrade is a common problem that
significantly reduces the mechanical properties and durability of both the ballast bed and …

The influence of operation times of manual tamping device on ballast bed state

Z Qian, H Xiao, Z Zhang, MM Nadakatti, Y Chi… - … and Building Materials, 2024 - Elsevier
The manual tamping device plays an important role in the daily maintenance and repair of
ballasted track. It is difficult to establish a suitable analytical model for manual operations …

Analysis of the influence of vibration frequency and amplitude on ballast bed tamping operation in railway turnout areas

Y Chi, H Xiao, Z Zhang, MM Nadakatti… - Computational Particle …, 2024 - Springer
Turnout is the essential track equipment to achieve train switching. To ensure a safe and
stable railway operation, it is significant to carry out scientific tamping operations in the …

Topological characterization and Gaussian projection reconstruction of ballast 3D contour

J Xiao, S Ding, H Liu, P Wang - Construction and Building Materials, 2024 - Elsevier
Geometric description and reconstruction of ballast is the basis of ballasted track bed
refinement research. In this paper, Laser scanning is used to establish the ballast contour …

Study on the splashing behavior of high-speed railway ballast in ice and snow environment: Analysis of the influence of the train speed, ice mass and striking position

H Xiao, Y Chi, Z Zhang, MM Nadakatti, S Wei - Construction and Building …, 2024 - Elsevier
The snow flight in severe cold regions has occurred on many high-speed railway lines in
China, directly impacting the safety of high-speed railway operations. However, the research …

Minimizing breakage and optimizing ballast reusability during excavation for ballast cleaning: A computationally efficient model and operational parameter …

Y Xiao, L Gao, S Shi, C Wang, W Cui, Y Li - Computers and Geotechnics, 2024 - Elsevier
During the excavation for ballast cleaning, intense interactions result in ballast breakage
and damage. This reduces both the reusable mass and the mechanical properties of …

Ballast Settlement Accumulation in Zones with Unsupported Sleepers

O Nabochenko, M Sysyn, S Fischer - Transportation Infrastructure …, 2024 - Springer
The high influence of impact and vibration on the behavior of crushed stone and ballast
materials has been known for a long time. The zones with unsupported sleepers, which are …

Numerical analysis of railway ballast tamping using a DEM-MBD co-simulation framework

P Malmsköld - 2024 - odr.chalmers.se
Railway ballast tamping is a process through which geometrical defects of railways are
corrected by moving the sleepers to their correct positions and inserting vibrating tamping …

[引用][C] Vibration characteristics and mesoscopic state evolution of ballasted track during dynamic stabilizing operation

Z Zhang, H Xiao, C Ma, Y Wang… - International Journal of …, 2024 - World Scientific
2 showed that the vertical vibration attenuation rate of the slope toe of the ballast bed after
the first stabilizing machine pass is 92.32%, while the vertical vibration attenuation rate of …