[PDF][PDF] Performance analysis of the European XFEL SRF cavities, from vertical test to operation in modules

N Walker, D Reschke, J Schaffran, L Steder… - Proc. LINAC' …, 2016 - accelconf.web.cern.ch
More than 800 resonators have been fabricated, vertically qualified and operated in module
tests before the accelerating module installation in the linac, which will be completed before …

[PDF][PDF] Performance of superconducting cavities for the European XFEL

D Reschke - this conference, THYB01, 2016 - accelconf.web.cern.ch
The superconducting accelerator of the European XFEL consists of the injector part and the
main linac. The injector includes one 1.3 GHz accelerator module and one 3.9 GHz third …

[PDF][PDF] Recent Progress with Eu-XFEL

D Reschke, D Hamburg - SFR, Canada, USA, 2015 - accelconf.web.cern.ch
The superconducting accelerator of the European XFEL consists of the injector part and the
main linac. The injector includes one 1.3 GHz accelerator module and one 3.9 GHz third …

[PDF][PDF] Infrastructure, methods and test results for the testing of 800 series cavities for the European XFEL

D Reschke - Proceedings of SRF, 2013 - accelconf.web.cern.ch
The main linac of the European XFEL will consist of 100 accelerator modules, ie 800
superconducting accelerator cavities operated at a design gradient of 23.6 MV/m. The …

[PDF][PDF] Production process for the european XFEL re-entrant cavity BPM

C Simon, C Boulch, P Carbonnier, P Contrepois… - proceedings of …, 2014 - jacow.org
Abstract As In-Kind contributor to the E-XFEL project, CEA is committed to the procurement
of around one third (31) cold beam position monitors (BPM) of the re-entrant RF cavities type …

[PDF][PDF] Configuration Management in the Series Production of the XFEL Accelerator Modules

L Hagge, S Barbanotti, A Frank, K Jensch, D Käfer… - THPRO006 …, 2014 - s3.cern.ch
The series production of the superconducting accelerator modules for the European XFEL
requires a production rate of one module per week. To reach this goal, assembly procedures …

[PDF][PDF] Clean room integration of the European XFEL cavity strings

S Berry, C Cloué, C Madec, O Napoly… - IPAC14, Dresden …, 2014 - inspirehep.net
The 101 cryomodules of the XFEL cold linac will be integrated at Saclay under the CEA
responsability by the industrial operator ALSYOM, at the production rate of cryomodule per …

Cryogenics in particle accelerators and fusion reactors

J Weisend, J Fydrych, A May… - Cryogenics …, 2022 - iopscience.iop.org
Particle accelerators, particularly high energy ones, utilise a range of cryogenic equipment
including superconducting magnets and superconducting cavities. This chapter looks at the …

[PDF][PDF] Analysis of the RF test results from the on-going cavity production for the European XFEL

D Reschke, S Aderhold, V Gubarev, J Schaffran… - proceedings of …, 2014 - inspirehep.net
The main Linac of the European XFEL will consist of 100 superconducting accelerator
modules, operated at an average design gradient of 23.6 MV/m. The fabrication by industry …

[PDF][PDF] Engineering Collaboration Experience at the European XFEL

L Hagge, M Hüning, J Kreutzkamp - 8th Int. Particle Accelerator …, 2017 - bib-pubdb1.desy.de
Efficient engineering is among the critical success factors for any accelerator project. It
requires an effective project organization, fast and efficient engineering processes, a culture …