Preliminary resource-based estimates combining artificial intelligence approaches and traditional techniques

BG De Soto, BT Adey - Procedia engineering, 2016 - Elsevier
The fate of many construction projects is determined using preliminary project cost
estimates. These estimates play a key role during the conceptual phase of projects; as in …

A hybrid methodology to estimate construction material quantities at an early project phase

B García de Soto, BT Adey… - International Journal of …, 2017 - Taylor & Francis
Preliminary project cost estimates are the first serious estimates made on a project. They
play an important role during the decision-making process, and are the benchmark with …

A process for the development and evaluation of preliminary construction material quantity estimation models using backward elimination regression and neural …

B García de Soto, BT Adey… - Journal of Cost Analysis …, 2014 - Taylor & Francis
During the early stages of a project, it is beneficial to have an accurate preliminary estimate
of its cost. One way to make those estimates is by determining the amount of construction …

Seismic assessment and parametric analysis on a multi-level aseismic simply-supported bridge with cable-restraining composite rubber bearings and dissipative …

H Zhong, J Guo, W Yuan, Z Wang, X Dang… - Soil Dynamics and …, 2024 - Elsevier
Recent earthquakes uncovered the potential risk of widely-used simply-supported bridges
(SSBs) to suffer severe bearing and pier damage, which may not be mitigated efficiently by …

A comparison of concrete quantities for highway bridge projects: preconstruction estimates vs onsite records

BA Olanrewaju, DK Panesar, S Saxe - Sustainable and Resilient …, 2022 - Taylor & Francis
This paper compares onsite concrete quantities to preconstruction estimates for 18 highway
bridges in Canada to quantify the differences in quantities and to identify the driving factors …

Conceptual quantities estimation using bootstrapped support vector regression models

OS Idowu, KC Lam - Journal of Construction Engineering and …, 2020 - ascelibrary.org
Conceptual cost models do not provide details of materials, equipment, or personnel that
make up construction cost. Therefore, obtaining project details for early resource planning …

Seismic Performance Assessment of Girder Bridges with Composite Rubber Bearings

HQ Zhong, XZ Dang, XW Deng, JJ Guo… - Journal of Physics …, 2023 - iopscience.iop.org
The objective of this study is to analytically assess the effectiveness of a novel composite
rubber bearing (CRB), which is proposed to enhance both the displacement and damping …

[图书][B] Parametric functions for conceptual and feasibility estimating in public highway project portfolios

NB Blampied - 2018 - search.proquest.com
Owners face challenges in setting priorities between potential projects to maintain,
rehabilitate, and improve their infrastructure. The estimated cost of each potential project is a …

Strategic Scheduling of Infrastructure Repair and Maintenance: Volume 2—Developing Condition-Based Triggers for Bridge Maintenance and Rehabilitation …

Z Zhang, S Labi, JD Fricker, KC Sinha - 2017 - docs.lib.purdue.edu
Even for the right treatment, improper timing can have consequences: premature application
(treatment is applied too early) could mean wasteful spending even if users enjoy the …

Conceptual Cost Estimation Models for Bridge Projects

AE Essegbey - 2021 - search.proquest.com
Conceptual cost estimating is typically completed early in the project lifecycle when little
design work has been completed. Because little information is known at this early stage, the …