The front-end of projects: a systematic literature review and structuring
This paper summarizes the results of a comprehensive systematic literature survey on the
front-end of a project, commissioned by the Project Management Institute. The dedicated …
front-end of a project, commissioned by the Project Management Institute. The dedicated …
Construction planning and scheduling of a renovation project using BIM-based multi-objective genetic algorithm
P Nusen, W Boonyung, S Nusen, K Panuwatwanich… - Applied Sciences, 2021 - mdpi.com
Featured Application Building information modeling with multi-objective genetic algorithm.
Abstract Renovation is known to be a complicated type of construction project and prone to …
Abstract Renovation is known to be a complicated type of construction project and prone to …
BIM 4D no planejamento de obras: detalhamento, benefícios e dificuldades
Os processos de Planejamento e Controle de Obras (PCO) subsidiam o cumprimento do
custo, prazo e qualidade esperado da obra. Estes apresentam influência direta sob a …
custo, prazo e qualidade esperado da obra. Estes apresentam influência direta sob a …
[PDF][PDF] BIM-tool development enhancing collaborative scheduling for pre-construction
M Viklund Tallgren, M Roupé… - Journal of …, 2020 - research.chalmers.se
Construction projects often suffer from backlashes in relation to poor plans and schedules.
Especially pre-construction planning has been challenging due to a high complexity, an …
Especially pre-construction planning has been challenging due to a high complexity, an …
[PDF][PDF] A Systematic Literature Review: The Front End of Projects
This report describes the results of a detailed, comprehensive, systematic literature survey
on the front end of a project, commissioned by the Project Management Institute (PMI). It is …
on the front end of a project, commissioned by the Project Management Institute (PMI). It is …
[图书][B] Collaborative production planning with BIM–Design, development and evaluation of a Virtual Production Planning system
MV Tallgren - 2021 - search.proquest.com
Construction projects have for a long time been characterized by increased specialization,
low productivity, and a fragmented information exchange culture, resulting in inefficient work …
low productivity, and a fragmented information exchange culture, resulting in inefficient work …
Development of a Multi-Objective Resource-Constrained Scheduling Method for the Utility Construction Sector
S Kosters - 2024 - essay.utwente.nl
This research addresses challenges faced by the utility construction sector in creating and
revising operational schedules. The absence of standardised methodologies leads to a high …
revising operational schedules. The absence of standardised methodologies leads to a high …
An investigation of construction professionals' perceptions of construction managers' soft skills in complex construction projects in South Africa
MS Sekhu - wiredspace.wits.ac.za
Purpose: The purpose of this study was to investigate construction professionals'
perceptions of construction managers' soft skills in complex construction projects in South …
perceptions of construction managers' soft skills in complex construction projects in South …
Innovation of building processes in Syria by using BIM
SS Ahmed - 2018 - search.proquest.com
The construction industry is one of the significant economic supports for developed and
developing countries alike. There is huge dissatisfaction with the quality, cost and delay of …
developing countries alike. There is huge dissatisfaction with the quality, cost and delay of …
An Ontological Study on the State of the Turkish Construction Industry and its Implementation of Building Information Modeling (BIM)
ASM Ihmaid - 2020 - i-rep.emu.edu.tr
Due to the inconvenience of old and traditional ways of work in the Architecture, Engineering
and Construction (AEC) industry, Building Information Modeling (BIM) was introduced and is …
and Construction (AEC) industry, Building Information Modeling (BIM) was introduced and is …