PIKOHYDRO DESIGN STRATEGY FOR OPTIMIZING HAVERSTING AND ENERGY EFFICIENCY USING GENETIC ALGORITHM
M Dhemahestri, Y Rahmawati - International Conference on …, 2023 - asasijournal.com
Electrical energy is a primary need at this time. In Indonesia itself, there are still several
areas that still have problems with electricity supply. There is a need for innovation related to …
areas that still have problems with electricity supply. There is a need for innovation related to …
Analysis of Generating Pico Hydro Power Plants (PLTPH) Case Study: Reservoir E Institut Teknologi Sumatera
The mission of the Institut Teknologi Sumatera (ITERA) is to contribute to the empowerment
of the potential that exists in the Sumatra region. In line with this mission, in an effort to …
of the potential that exists in the Sumatra region. In line with this mission, in an effort to …