BIM in off-site manufacturing for buildings

FH Abanda, JHM Tah, FKT Cheung - Journal of building engineering, 2017 - Elsevier
The need to overcome challenges faced by construction industry has been at the core of
many government reports. Most of the reports suggest the adoption of innovations including …

[图书][B] Cost and revenue overruns of the Olympic Games 2000–2018

H Preuß, W Andreff, M Weitzmann - 2019 - library.oapen.org
In this open access book the cost and revenue overruns of Olympic Games from Sydney
2000 to PyeongChang 2018 from eight years before the Games to Games‐time are …

Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: case studies in Ethiopia

S Melaku Belay, S Tilahun, M Yehualaw… - Advances in Civil …, 2021 - Wiley Online Library
Today, several developing countries struggle to improve the cost and time performances of
major infrastructure works due to various reasons. Cost overrun and delay are one of the …

The contributions of construction material waste to project cost overruns in Abuja, Nigeria

I Saidu, W Shakantu - Acta Structilia: Journal for the Physical and …, 2016 - journals.co.za
Material wastage on construction sites can contribute to cost overruns. Research to provide
evidence of the extent of material wastages' contribution to cost overruns on construction …

[PDF][PDF] Management of material waste and cost overrun in the Nigerian construction industry

I Saidu, M Shakantu - 2016 - core.ac.uk
While wastage of materials has become a serious problem requiring urgent attention in the
Nigerian Construction Industry, cost overrun is a problem, which affects 90 percent of the …

Strategies to reduce cost overruns and schedule delays in construction projects

A Al-Keim - 2017 - search.proquest.com
Senior managers fail to control time and costs of construction projects despite available
advanced project management tools. Based on project management theory, the objective of …

Changes of costs, expenditures, and revenues between bidding and staging the Olympic games from Sydney 2000 to Tokyo 2020

H Preuss, M Weitzmann - Event Management, 2023 - ingentaconnect.com
Expected large cost overruns of Olympic Games have recently led to negative referendums.
We will analyze the costs and revenues of the Olympic Games and how they change from …

A post-contract project analysis of material waste and cost overrun on construction sites in Abuja, Nigeria

I Saidu, W Shakantu - Acta Structilia, 2017 - ajol.info
Material waste and cost overrun have been identified as common problems in the
construction industry. These problems occur at both pre-and post-contract stages of a …

[HTML][HTML] Construction machinery hire rates deviation in Malaysia: an inflation rate effect analysis

M Ali Musarat, W Salah Alaloul, MS Liew - Revista de la construcción, 2021 - SciELO Chile
Machinery has been used in the construction industry in both small-and large-scale projects
for a long time. Machinery is one of the main resources of any construction projects and …

Using Artificial Intelligence and computation Enhanced apply in neural network

IF Varouqa - Journal of Applied Science and Engineering, 2021 - jase.tku.edu.tw
The present study focuses on the optimization techniques to minimize time and cost in
prefabricated constructions. Artificial Neural Networks (ANNs) are used for optimization, due …