Cost deviation model of construction projects in Saudi Arabia using PLS-SEM

AM Alsugair - Sustainability, 2022 - mdpi.com
Miscalculations during cost estimation can have adverse effects on construction projects,
including delaying or canceling planned projects, reducing project scope, and creating …

Causes of cost overruns in building construction projects in Asian countries; Iran as a case study

S Amini, A Rezvani, M Tabassi… - Engineering …, 2023 - emerald.com
Purpose Cost overruns have been identified as the most significant challenge for
construction sector stakeholders. Like many developing countries, the Iranian construction …

Factors leading to failures of infrastructure development projects in Pakistan: A systematic literature review

S Nisar, R Asif - Management Science Letters, 2023 - m.growingscience.com
Public sector development projects are found to have poor repute in terms of completion
within assigned cost and time. Almost every 2nd project is impacted by financial burdens …

Rationalizing critical cost overrun factors on public sector housing programmes

AA Chadee, H Martin, A Mwasha… - Emerging Science …, 2022 - pure.qub.ac.uk
The cost overrun phenomenon on projects worldwide creates a major source of risk that
warrants investigation. The prevailing factor school of thought provides strong empirical …

An analysis of the qualitative impacts of building information modelling (BIM) on life cycle cost (LCC): a qualitative case study of the KSA

E Alasmari, P Martinez-Vazquez, C Baniotopoulos - Buildings, 2023 - mdpi.com
Building information modelling (BIM) continues gaining popularity in engineering
construction as it helps lower the life cycle cost and ensure sustainability. The primary aim of …

Risks leading to cost overrun in construction projects: A systematic literature review

M Enrica, HH Purba, A Purba - Advance Researches in Civil Engineering, 2021 - arce.ir
In construction projects in the world, there is generally a final cost overrun on the completion
of construction projects. The cost overruns occur when the project has to face various risks …

The impact of perceived organizational politics and political risk on project success through ethical leadership and the psychological contract

JA Turi, M Sarfraz - Kybernetes, 2023 - emerald.com
Purpose Political risk devastates social and economic developmental projects. Countries
with political stability attract foreign direct investment (FDI) and engage domestic investment …

Project management challenges in client‐consultant decision‐making: A case for the Ghanaian mining construction industry

AA Amegboleza, A Acakpovi… - Canadian Journal of …, 2024 - Wiley Online Library
This study explores the complex decision‐making (DM) dynamics between clients and
consultants, a crucial area often neglected in existing research. Utilizing a Multi‐Perspective …

[PDF][PDF] Cost overrun gap analysis in construction projects: State-of-the-art

M Abdel-Monem, AR El-Mohr… - … Journal-Faculty of …, 2022 - erjsh.journals.ekb.eg
Poor cost performance is a typical problem in construction projects where few projects were
completed within the original estimated cost. The previous researches (literature) show that …

Cost deviation causes in Colombian construction projects: a frequency and severity analysis

O Sánchez, K Castañeda, RF Herrera… - … de innovación y …, 2021 - ieeexplore.ieee.org
Construction projects, both in developed and developing countries, are widely affected by
cost deviations that arise at the completion of the construction process; these deviations …