Influence of abrasive waterjet pre-cutting slit on the performance of shield cutter cutting reinforced concrete
B Liu, M Hu, B Zhang, B Li, B Xu, C Huang, H Yu… - … and Underground Space …, 2023 - Elsevier
To improve the efficiency and safety of shield machines cutting reinforced concrete (RC)
obstacles, using an abrasive waterjet (AWJ)-assisted shield cutter to cut RC is considered a …
obstacles, using an abrasive waterjet (AWJ)-assisted shield cutter to cut RC is considered a …
The influence of existing piles on station settlement during the construction of a tunnel undercrossing under existing stations
B Ma, S Wu, Q Chen, E Liang, X Li - Scientific Reports, 2024 - nature.com
In the construction of tunnels under existing stations, it is necessary to control their
settlement. When there is a pile foundation in the existing station, the pile cutting has a …
settlement. When there is a pile foundation in the existing station, the pile cutting has a …
Evaluation method and application for cutter wear of large-diameter shield in composite stratum: A case study
J Wu, X Chen, X Shen, D Su, Y Zhang, Z Yao, X Wang - Measurement, 2025 - Elsevier
As a crucial equipment for cutting through hard rock in a shield machine, wear of disc cutter
is inevitable in tunnel construction. Excessive wear can lead to reduced tunneling …
is inevitable in tunnel construction. Excessive wear can lead to reduced tunneling …
Theoretical Analysis of Longitudinal Vertical Displacement of Subway Tunnels Caused by the Construction of Steel Casings for Bridge Piles
The construction of new bridge piles adjacent to existing subway tunnels poses a significant
threat to the safety of the tunnels. To accurately assess the impact of the construction of the …
threat to the safety of the tunnels. To accurately assess the impact of the construction of the …
Mechanical Properties and Influencing Factors of Shield Cutting Existing Station Supporting Piles
X Guan, Z Liu, H Xu, Y Liu, X Ling, H Ding, S Ren, R Lu… - Sustainability, 2023 - mdpi.com
Based on the shield-cutting existing station supporting piles project of Zhengzhou metro line
6, the process and mechanism of concrete in the process of pile cutting were analyzed by …
6, the process and mechanism of concrete in the process of pile cutting were analyzed by …
砾砂地层盾构切削大直径群桩的刀具研究.
乔世范, 张睿, 王广, 王刚, 陈道龙… - Journal of Railway …, 2024 - search.ebscohost.com
刀盘刀具是盾构机实现切削功能并保证其顺利推进的主要部件, 合适的刀具选型与设计在保证盾
构机成功切削大直径钢筋混凝土群桩的过程中至关重要. 依托沈阳地铁4 号线盾构切桩工程 …
构机成功切削大直径钢筋混凝土群桩的过程中至关重要. 依托沈阳地铁4 号线盾构切桩工程 …
Experimental study on shield machine cutting steel-reinforced concrete diaphragm wall
P Shi, Y Tao, P Jia, Z Wang, H Nie - Tunnelling and Underground Space …, 2024 - Elsevier
Shield tunneling during metro construction frequently hits steel reinforced concrete
diaphragm walls. A high risk is involved in using a shield machine to cut through a …