Bi-objective parallel machine scheduling with additional resources during setups
We present a bi-objective parallel machine scheduling problem with machine and job
sequence dependent setup times, with the additional consideration of resources needed …
sequence dependent setup times, with the additional consideration of resources needed …
GRASP algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources
This paper provides practitioners with new approaches for solving realistic scheduling
problems that consider additional resources, which can be implemented on expert and …
problems that consider additional resources, which can be implemented on expert and …
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
A Hasani, SMH Hosseini - Computers & Operations Research, 2022 - Elsevier
This paper investigates a flexible flow shop scheduling problem wherein there are some
unrelated parallel machines with different technology levels in the first stage. Some of these …
unrelated parallel machines with different technology levels in the first stage. Some of these …
Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost
A Kordmostafapour, J Rezaeian, I Mahdavi, MY Farjad - Opsearch, 2022 - Springer
In this study, the unrelated parallel machine scheduling problem where the processing time
of jobs is controllable based on resource allocation is considered which the completed jobs …
of jobs is controllable based on resource allocation is considered which the completed jobs …
[HTML][HTML] Applications of constraint programming in production scheduling problems: A descriptive bibliometric analysis
Production scheduling is a class of widely studied combinatorial optimization problems.
Given the complexity of the most addressed production environments several solution …
Given the complexity of the most addressed production environments several solution …
[PDF][PDF] Guided genetic algorithm for solving unrelated parallel machine scheduling problem with additional resources
This paper solved the unrelated parallel machine scheduling with additional resources
(UPMR) problem. The processing time and the number of required resources for each job …
(UPMR) problem. The processing time and the number of required resources for each job …
Hybridizing guided genetic algorithm and single-based metaheuristics to solve unrelated parallel machine scheduling problem with scarce resources
This paper focuses on solving unrelated parallel machine scheduling with resource
constraints (UPMR). There are j jobs, and each job needs to be processed on one of the …
constraints (UPMR). There are j jobs, and each job needs to be processed on one of the …
Constraint programming versus heuristic approach to MapReduce scheduling problem in Hadoop YARN for energy minimization
In this paper, we consider a deadline-constrained MR scheduling problem of minimizing
energy consumption in Hadoop's generic resource manager known as yet another resource …
energy consumption in Hadoop's generic resource manager known as yet another resource …
Review on unrelated parallel machine scheduling problem with additional resources
This study deals with an unrelated parallel machine scheduling problem with additional
resources (UPMR). That is one of the important sub-problems in the scheduling. UPMR …
resources (UPMR). That is one of the important sub-problems in the scheduling. UPMR …
Secuenciación de máquinas con necesidad de ajustes y recursos adicionales.
JC Yepes Borrero - 2021 - riunet.upv.es
[ES] En esta tesis doctoral se estudia el problema de secuenciación de máquinas paralelas
no relacionadas con necesidad de ajustes y recursos adicionales asignados en los ajustes …
no relacionadas con necesidad de ajustes y recursos adicionales asignados en los ajustes …