A survey of scheduling problems with no-wait in process
A Allahverdi - European Journal of Operational Research, 2016 - Elsevier
Scheduling involving no-wait in process plays an important role in industries such as plastic,
chemical, and pharmaceutical. Moreover, many scheduling problems in other industries …
chemical, and pharmaceutical. Moreover, many scheduling problems in other industries …
A comprehensive review of Branch-and-Bound algorithms: Guidelines and directions for further research on the flowshop scheduling problem
CP Tomazella, MS Nagano - Expert Systems with Applications, 2020 - Elsevier
This article is a comprehensive review of Branch-and-Bound algorithms for solving flowshop
scheduling problems, from the early works of Ignall and Schrage (1965) and Brown and …
scheduling problems, from the early works of Ignall and Schrage (1965) and Brown and …
A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning
This paper deals with an integrated optimisation model for production scheduling and
preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull …
preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull …
IFSJSP: a novel methodology for the job-shop scheduling problem based on intuitionistic fuzzy sets
The Job-Shop Scheduling Problem (JSP) is an important concern in advanced
manufacturing systems. In real applications, uncertainties exist practically everywhere in the …
manufacturing systems. In real applications, uncertainties exist practically everywhere in the …
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
B Vahedi Nouri, P Fattahi… - International Journal of …, 2013 - Taylor & Francis
Job scheduling and maintenance activities scheduling are two important issues in
production management, which are often addressed separately. In this paper, the non …
production management, which are often addressed separately. In this paper, the non …
Due date quoting and rescheduling in a fixed production sequence
H Jodlbauer, S Tripathi - International Journal of Production …, 2024 - Taylor & Francis
In this article, the due date setting problem consisting of due date quoting, order insertion
and rescheduling with relevant sequence-dependent setups and a frozen zone is …
and rescheduling with relevant sequence-dependent setups and a frozen zone is …
A hybrid scatter search method for solving fuzzy no-wait flow-shop scheduling problems
The literature published since the year 2000 was reviewed regarding the no-wait flow-shop
scheduling (No-WFSS) problem. The No-WFSS problem with separate set-up times and …
scheduling (No-WFSS) problem. The No-WFSS problem with separate set-up times and …
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
This paper explores a no-wait hybrid flow shop scheduling problem (NWHFSSP) with
realistic assumptions, including unrelated parallel machines at each stage, machine …
realistic assumptions, including unrelated parallel machines at each stage, machine …
A hybrid differential evolution algorithm for a two-stage flow shop on batch processing machines with arbitrary release times and blocking
H Chen, S Zhou, X Li, R Xu - International Journal of Production …, 2014 - Taylor & Francis
Batch processing machines (BPMs) have important applications in a variety of industrial
systems. This paper considers the problem of scheduling two BPMs in a flow shop with …
systems. This paper considers the problem of scheduling two BPMs in a flow shop with …
A hybrid genetic algorithm for non-permutation flow shop scheduling problems with unavailability constraints
WW Cui, Z Lu, B Zhou, C Li, X Han - International Journal of …, 2016 - Taylor & Francis
This article deals with the non-permutation flow shop scheduling problems with non-
availability intervals. Specifically, two kinds of unavailability constraints are investigated and …
availability intervals. Specifically, two kinds of unavailability constraints are investigated and …