Iterated greedy algorithms for flow-shop scheduling problems: A tutorial

ZY Zhao, MC Zhou, SX Liu - IEEE Transactions on Automation …, 2021 - ieeexplore.ieee.org
An iterated greedy algorithm (IGA) is a simple and powerful heuristic algorithm. It is widely
used to solve flow-shop scheduling problems (FSPs), an important branch of production …

A review of green shop scheduling problem

M Li, GG Wang - Information Sciences, 2022 - Elsevier
The manufacturing industry directly reflects the productivity level of a country and plays an
important role in economic and social development. However, with the development of the …

Sustainable, resilient and responsive mixed supply chain network design under hybrid uncertainty with considering COVID-19 pandemic disruption

MM Vali-Siar, E Roghanian - Sustainable production and consumption, 2022 - Elsevier
The occurrence of the COVID-19 pandemic is a disruption that has adversely affected many
supply chains (SCs) around the world and further proved the necessity of combination and …

Research on flexible job shop scheduling under finite transportation conditions for digital twin workshop

J Yan, Z Liu, C Zhang, T Zhang, Y Zhang… - Robotics and Computer …, 2021 - Elsevier
Flexible job shop scheduling is one of the most effective methods for solving multiple
varieties and small batch production problems in discrete manufacturing enterprises …

An effective iterated greedy method for the distributed permutation flowshop scheduling problem with sequence-dependent setup times

JP Huang, QK Pan, L Gao - Swarm and Evolutionary Computation, 2020 - Elsevier
The distributed permutation flowshop scheduling problem (DPFSP) has attracted much
attention in recent years. In this paper, we extend the DPFSP by considering the sequence …

A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times

Y Li, X Li, L Gao, B Zhang, QK Pan… - … Journal of Production …, 2021 - Taylor & Francis
With the development of global and decentralised economies, distributed production
emerges in large manufacturing firms. A distributed production model exists with hybrid …

A multiobjective evolutionary algorithm based on decomposition for hybrid flowshop green scheduling problem

B Zhang, Q Pan, L Gao, X Li, L Meng, K Peng - Computers & Industrial …, 2019 - Elsevier
Energy saving has attracted growing attention due to the advent of sustainable
manufacturing. By this motivation, this paper studies a hybrid flowshop green scheduling …

[HTML][HTML] Energy-aware decision support models in production environments: A systematic literature review

K Bänsch, J Busse, F Meisel, J Rieck, S Scholz… - Computers & Industrial …, 2021 - Elsevier
The substantial amount of energy consumed through industrial production has given rise to
a large number of research papers that incorporate environmental aspects and increased …

Resilient mixed open and closed-loop supply chain network design under operational and disruption risks considering competition: A case study

MM Vali-Siar, E Roghanian, A Jabbarzadeh - Computers & Industrial …, 2022 - Elsevier
This study addresses the problem of resilient mixed open and closed-loop supply chain
network design under operational and disruption risks as a fundamental domain in supply …

MIP modeling of energy-conscious FJSP and its extended problems: From simplicity to complexity

L Meng, P Duan, K Gao, B Zhang, W Zou, Y Han… - Expert Systems with …, 2024 - Elsevier
Regarding four different energy-conscious scheduling problems, namely, flexible job shop
scheduling problem (FJSP), FJSP with transportation time (FJSP-T), FJSP with sequence …