The non-permutation flow-shop scheduling problem: a literature review

DA Rossit, F Tohmé, M Frutos - Omega, 2018 - Elsevier
Abstract The Non-Permutation Flow-Shop scheduling problem (NPFS) is a generalization of
the traditional Permutation Flow-Shop scheduling problem (PFS) that allows changes in the …

Flow-shop scheduling problem under uncertainties: Review and trends

E González-Neira, J Montoya-Torres… - … Journal of Industrial …, 2017 - m.growingscience.com
Among the different tasks in production logistics, job scheduling is one of the most important
at the operational decision-making level to enable organizations to achieve competiveness …

Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon …

M Alimian, V Ghezavati… - Computers & Industrial …, 2022 - Elsevier
This paper presents a novel Mixed-Integer Nonlinear Programming (MINLP) model for a
parallel-line Capacitated Lot-Sizing Problem (CLSP) with the sequence-dependent setup …

Integrated lot-sizing and scheduling: Mitigation of uncertainty in demand and processing time by machine learning

M Rohaninejad, M Janota, Z Hanzálek - Engineering Applications of …, 2023 - Elsevier
Production rescheduling is one of the most challenging problems in production
management, in which some parameters, such as customer demand and job processing …

A relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problems

CFM Toledo, M da Silva Arantes, MYB Hossomi… - Journal of …, 2015 - Springer
In this paper, we propose a simple but efficient heuristic that combines construction and
improvement heuristic ideas to solve multi-level lot-sizing problems. A relax-and-fix heuristic …

A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty

Z Hu, G Hu - International Journal of Production Economics, 2016 - Elsevier
A lot-sizing and scheduling problem with sequence-dependent setups is addressed in this
paper. In the production system, manufactories receive raw materials from upstream sites …

Designing an integrated reliable model for stochastic lot-sizing and scheduling problem in hazardous materials supply chain under disruption and demand uncertainty

M Mohammadi - Journal of Cleaner Production, 2020 - Elsevier
This research addresses the integrated lot-sizing and scheduling problem with complex
setup structure in which the required raw materials are hazardous and the inherent risk of …

Modeling of rock fragmentation by firefly optimization algorithm and boosted generalized additive model

Q Fang, H Nguyen, XN Bui, T Nguyen-Thoi… - Neural Computing and …, 2021 - Springer
This paper proposes a new soft computing model (artificial intelligence model) for modeling
rock fragmentation (ie, the size distribution of rock (SDR)) with high accuracy, based on a …

An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints

M Rohaninejad, B Vahedi-Nouri… - … Journal of Production …, 2024 - Taylor & Francis
Nowadays, achieving higher levels of flexibility in manufacturing systems is necessary to
maintain and enhance competitiveness. Accordingly, a new generation of production …

A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches

D Alem, E Curcio, P Amorim, B Almada-Lobo - Computers & Operations …, 2018 - Elsevier
This paper presents an empirical assessment of the General Lot-Sizing and Scheduling
Problem (GLSP) under demand uncertainty by means of a budget-uncertainty set robust …