[HTML][HTML] Plug & abandonment of offshore wells: Ensuring long-term well integrity and cost-efficiency

T Vrålstad, A Saasen, E Fjær, T Øia, JD Ytrehus… - Journal of Petroleum …, 2019 - Elsevier
There is an upcoming" P&A wave" of wells that need to be permanently plugged and
abandoned, especially in mature, offshore areas such as the North Sea and Gulf of Mexico …

Leakage calculator for plugged-and-abandoned wells

F Moeinikia, EP Ford, HP Lohne, Ø Arild… - SPE Production & …, 2018 - onepetro.org
The current practice on the Norwegian Continental Shelf (NCS) when designing solutions
for permanent plug and abandonment (P&A) complies with NORSOK Standard D-010. This …

Prioritizing Wells for Repurposing or Permanent Abandonment Based on Generalized Well Integrity Risk Analysis

D Zheng, C Turhan, N Wang, P Ashok… - SPE/IADC Drilling …, 2024 - onepetro.org
Wells with compromised integrity can cause groundwater/soil contamination and increased
carbon emissions. Given that there are more than 3.7 million abandoned wells in existence …

Developing a well-centric flow model-The first step in a risk-based approach to oil and gas well decommissioning

C Johnson, MH Sefat, D Davies - Journal of Petroleum Science and …, 2021 - Elsevier
The final stage in the life of a hydrocarbon well is decommissioning, which aims to ensure
that the original integrity of the cap rock is restored and all penetrated sub-surface …

Consequence quantification of barrier system failures in permanently plugged and abandoned wells

E Ford, F Moeinikia, MM Majoumerd… - SPE Norway …, 2018 - onepetro.org
Abstract Plug & abandonment (P&A) regulations on the Norwegian continental shelf are
largely prescriptive, since the same requirements are applied irrespective of well conditions …

Leakage Through Micro-Annulus Geometries Incorporating Pressure-Driven Elastic Deformation

K Beltrán-Jiménez, HJ Skadsem, D Gardner… - Offshore Technology …, 2019 - onepetro.org
The cement between the casings and formation is a critical barrier element for ensuring
zonal isolation. Shrinkage during curing and mechanical or thermal loads applied during …

Time-to-failure estimation of barrier systems in permanently plugged and abandoned wells

Ø Arild, HP Lohne, HJ Skadsem… - International …, 2019 - asmedigitalcollection.asme.org
With the increasing number of aging fields and wells worldwide, a large number of wells will
have to permanently plugged and abandoned in the coming decades. Today's technical …

Permanent P&A Design-What is Good Enough?

Ø Arild, HP Lohne, M Nielsen, F Moeinikia… - SPE Annual Technical …, 2018 - onepetro.org
Recently, there has been a drive towards a risk-based approach to plug & abandonment
(P&A) design. To apply a risk-based approach for decision-making, ie to decide if a P&A …

AI-Based Cement Bond Quality Assessment: A First Step for Optimizing P&A Design

TM Correia, IG Camerini, JAS Hidalgo… - Offshore Technology …, 2024 - onepetro.org
As decommissioning operations continue to expand, the challenges associated with
evaluating the integrity of the cement layer and its bond to casing and formation become …

Assessing Flow Potential Risk in Shallow Zones

R Piazza, P Netto, AP Grell, L Fernandes… - SPE Annual Technical …, 2024 - onepetro.org
Maintaining integrity is a major concern throughout the lifecycle of a well, especially during
the decommissioning stage. Regulatory requirements mandate that barriers be established …