A comprehensive review on NSGA-II for multi-objective combinatorial optimization problems

S Verma, M Pant, V Snasel - IEEE access, 2021 - ieeexplore.ieee.org
This paper provides an extensive review of the popular multi-objective optimization
algorithm NSGA-II for selected combinatorial optimization problems viz. assignment …

[HTML][HTML] An updated survey of variants and extensions of the resource-constrained project scheduling problem

S Hartmann, D Briskorn - European Journal of operational research, 2022 - Elsevier
The resource-constrained project scheduling problem is to schedule activities subject to
precedence and resource constraints such that the makespan is minimized. It has become a …

Multi-objective robust optimisation model for MDVRPLS in refined oil distribution

X Xu, Z Lin, X Li, C Shang, Q Shen - International Journal of …, 2022 - Taylor & Francis
At depots with refined oil shortage, arranging a reasonable distribution scheme with limited
supply affects operation costs, demand satisfaction rate of gasoline stations …

BIM-based resource tradeoff in project scheduling using fire hawk optimizer (FHO)

MB Shishehgarkhaneh, M Azizi, M Basiri, RC Moehler - Buildings, 2022 - mdpi.com
Project managers should balance a variety of resource elements in building projects while
taking into account many major concerns, including time, cost, quality, risk, and the …

Extensions of the resource-constrained project scheduling problem

H Ding, C Zhuang, J Liu - Automation in Construction, 2023 - Elsevier
The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of
activities subject to resource and precedence constraints to minimize the project makespan …

Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III)

Y Liu, K You, Y Jiang, Z Wu, Z Liu, G Peng… - Automation in …, 2022 - Elsevier
Unstructured and variable construction sites bring challenges that can be addressed with
the adoption of the flexible earthwork scheduling problem (FESP), which requires …

Automated generation of stacking plans for prefabricated panels transported by A-frame trailers

H Wang, W Yi, L Zhen, H Wang, APC Chan - Advanced Engineering …, 2023 - Elsevier
Prefabrication is a sustainable construction method that improves productivity and reduces
environmental footprints. Prefabricated panel is one typical type of components widely used …

A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem

DH Tran, MY Cheng, D Prayogo - Knowledge-Based Systems, 2016 - Elsevier
Multiple work shifts are commonly utilized in construction projects to meet project
requirements. Nevertheless, evening and night shifts raise the risk of adverse events and …

Optimization time-cost-quality-work continuity in construction management using mutation–crossover slime mold algorithm

PVH Son, LNQ Khoi - Applied Soft Computing, 2023 - Elsevier
This study presents the mutation–crossover slime mold algorithm (MCSMA) to balance the
time, cost, quality, and work continuity in a particular construction project. The slime mold …

Time–cost–quality trade-off analysis for planning construction projects

T Wang, M Abdallah, C Clevenger… - Engineering …, 2021 - emerald.com
Purpose Achieving project objectives in constructionprojects such as time, cost and quality is
a challenging task. Minimizing project cost often results in additional project duration and …