Kuat Lentur Beton Menggunakan Agregat Batu Petangis dan Pasir Semboja dengan Penambahan Botol Plastik

TW Widianto, AM Indriani… - … Manajemen Teknologi & …, 2023 - ojs.unik-kediri.ac.id
Utilizing local materials is a strategic step in optimizing concrete production in East
Kalimantan. There's an example supply of petangis stone and semboja sand aggregates …

Pengaruh Kultur Bakteri Pada Proses Biosementasi Tanah Laterit Terhadap Nilai CBR: The Influence Of Bacterial Culture On The Soil Laterite Biosementation …

AM Indriani, G Utomo, N Fitriyani - Media Ilmiah Teknik Sipil, 2023 - journal.umpr.ac.id
Tanah laterit memiliki tingkat pelapukan yang tinggi serta kembang susut yang tidak
seragam. Sehingga pada tanah ini kurang baik untuk dilakukan pekerjaan konstruksi …

Pengendalian Proyek Dengan Metode Earned Value Pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember

M Eriyanti, TD Kuryanto… - Sustainable Civil Building …, 2024 - journal.pubmedia.id
The rehabilitation of the DI Sumber Nangka Irrigation Network takes 180 days or about 6
months to implement, with a budget of Rp. 4,077,964,693. In this study, the authors will …

[PDF][PDF] ANALISIS KUAT TEKAN BETON MODIFIKASI POLYETHYLENE TEREPHTHALATE (PET)

Y Wahyudi, AM Indriani… - … Nasional Teknik Sipil …, 2023 - konteks17.uniba-bpn.ac.id
Beton merupakan salah satu material yang umum digunakan pada dunia konstruksi baik itu
konstruksi yang sederhana maupun kompleks. Beton adalah bahan konstruksi yang paling …

The Effect of 0.8% Polyethylene Terephthalate Plastic Waste Substitution on the Flexural Strength on K-175 Concrete

G Utomo, AM Indriani… - E3S Web of …, 2024 - e3s-conferences.org
The use of plastics in daily life continues to increase in a variety of uses. One of the most
commonly used plastic that is difficult to decompose is Polyethylene Terephthalate (PET) …

COST AND TIME PERFORMANCE ANALYSIS USING EARNED VALUE METHOD OF WHEAT SILO & PELLET SILO STRUCTURE REPAIR PROJECT PHASE 3 PT …

EO Saputra, H Muhammadun… - INTERNATIONAL …, 2024 - ojs.transpublika.com
The wheat silo and pellet silo structure repair project phase 3 by PT. ISM Bogasari Surabaya
is an annual infrastructure maintenance and strengthening activity to support the smooth …

Performance Analysis System Using Earned Value Method For Electrical Greenhouse Work Project In Batam City

S Lu, M Pamadi - Jurnal Indonesia Sosial Teknologi, 2023 - jist.publikasiindonesia.id
Infrastructure projects, such as greenhouse construction, are necessary for economic
growth. Effective project control is essential, especially in managing budgets and ensuring …

MONITORING PENGENDALIAN WAKTU, BIAYA, DAN PROGRES PEKERJAAN DENGAN LAPORAN KEMAJUAN PEKERJAAN DAN MENGGUNAKAN METODE …

R Respati, RH Hio, N Handayani - … : Islamic University of …, 2023 - ojs.uniska-bjm.ac.id
Abstrak Proyek Pembangunan Asrama Mahasiswa Barito Utara di Palangka Raya
merupakan bangunan milik pemerintahan Kabupaten Barito Utara. Dimana dalam …

ANALISIS KINERJA BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN JALAN AKSES PELABUHAN UJUNG …

AH Ramadhan, T Yulianto, T Sundari… - … dan Aplikasi Teknik …, 2024 - ejournal.unhasy.ac.id
Pelaksanaan proyek konstruksi sering menghadapi kendala biaya dan waktu, sedangkan
proyek dituntut selesai sesuai jadwal yang tepat. Untuk mengatasi masalah tersebut …

[引用][C] Pengaruh Microbially Induced Calcite Precipitation (MICP) terhadap Perilaku Kuat Geser Tanah Terkontaminasi Batubara

AM Indriani, G Utomo - Cived, 2023