Application and Experimental Validation of Seven-Degree-of-Freedom Beam Element for Girder Bridges during Deck Construction

L Hui, M Ashiquzzaman, R Hindi - Infrastructures, 2023 - mdpi.com
During bridge deck construction, the deck finishing machine and the fresh concrete often
produce large vertical loads and torsional moments acting on the bridge girder system. In …

Effectiveness of Exterior-Beam Rotation-Prevention Systems for Bridge Deck Construction—Phase II

H Li, F Hraib, M Vicente, R Hindi - FHWA-ICT-19-011, 2019 - ideals.illinois.edu
During bridge deck construction, construction loads are transferred through the overhang-
formwork system into the girder system, resulting in significant torsional moments acting on …

Evaluation of bridge exterior girder rotation during construction

F Hraib, L Hui, M Vicente, R Hindi - Engineering Structures, 2019 - Elsevier
During bridge construction, many loads affect its behavior and can be critical to its future
performance. The screed machine and the fresh concrete loads acting on the overhang …

Deep learning for evaluation of girder rotation during bridge deck construction

L Hui, R Hindi - Bridge Maintenance, Safety, Management …, 2024 - taylorfrancis.com
During bridge deck construction, overhang brackets are commonly utilized to resist the
weight of fresh concrete and the loads from heavy construction equipment. These loads …

Predicting the Girder Rotation for Bridge Deck Construction Using Deep Neural Network

L Hui, R Hindi - Structures Congress 2023 - ascelibrary.org
Bridge deck construction often uses overhang brackets to support the deck overhang
formwork, the self-weight of the fresh concrete, and the loads from the heavy construction …

Field evaluation of pipe-tie system in limiting the girder rotation during bridge deck construction

L Hui, F Hraib, M Vicente, R Hindi - Bridge Safety, Maintenance …, 2022 - taylorfrancis.com
The bridge deck construction of often involves different types of construction equipment to
accelerate the construction procedure and form a smooth deck surface. To support the …

Optimization and Evaluation of Pipe-Tie System in Limiting the Exterior Girder Rotation during Deck Construction

L Hui, F Hraib, M Vicente, R Hindi - Structures Congress 2022, 2022 - ascelibrary.org
The construction of a bridge deck often introduces significant loads acting on the bridge
girder system. These loads generally come from the construction equipment, the weight of …

Numerical and Experimental Evaluation of Bridge Exterior Girder During Deck Construction

L Hui - 2019 - search.proquest.com
The main issue in bridge deck construction is the torsional moments applied on exterior
girders, mostly due to the weight of the deck finishing machine and the fresh concrete on the …

Effect of temporary bracing system on the overhang deflection in skewed bridges during deck slab construction

F Hraib, L Hui, R Hindi, M Vicente - Bridge Maintenance, Safety …, 2021 - taylorfrancis.com
During construction of the deck slab in steel girder bridges, fresh concrete weight and the
finishing machine weight produce torsional moments in exterior girders due to the overhang …

Assessment of different rotation prevention systems for bridge deck construction through field monitoring

L Hui, F Hraib, M Vicente, R Hindi - Bridge Maintenance, Safety …, 2021 - taylorfrancis.com
During bridge deck construction, the construction loads often transfer through the formwork
system and overhang brackets to the bridge girders, leading to significant torsional moments …