Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity
M Atsmony, B Mor, G Mosheiov - Computers & Operations Research, 2023 - Elsevier
We study single machine scheduling problems with the following features:(i) Generalized
due-dates are considered, ie, the j-th due-date is assigned to the j-th completed job;(ii) A …
due-dates are considered, ie, the j-th due-date is assigned to the j-th completed job;(ii) A …
Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
We consider a single-machine scheduling problem with generalized and periodic due dates
such that each due date is assigned not to a specific job but to a position and the lengths of …
such that each due date is assigned not to a specific job but to a position and the lengths of …
Scheduling with generalized and periodic due dates under single-and two-machine environments
We consider scheduling problems such that the due date is assigned to a job, depending on
its position, and the intervals between consecutive due dates are identical. The objective is …
its position, and the intervals between consecutive due dates are identical. The objective is …
Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
We consider a single-machine scheduling problem such that the due dates are assigned to
each job depending on its order, and the lengths of the intervals between consecutive due …
each job depending on its order, and the lengths of the intervals between consecutive due …
Two-machine ordered flow shop scheduling with generalized due dates
We consider a two-machine flow shop scheduling with two properties. The first is that each
due date is assigned for a specific position different from the traditional definition of due …
due date is assigned for a specific position different from the traditional definition of due …
A single machine scheduling with generalized and periodic due dates to minimize total deviation
We consider a single-machine scheduling problem such that the due date is assigned not to
a specific job, but to a job position, with identical intervals between consecutive due dates …
a specific job, but to a job position, with identical intervals between consecutive due dates …
PDD 规则下最小化最大延误调度问题.
万龙, 黄晓莉, 梅嘉杰 - Operations Research Transactions …, 2022 - search.ebscohost.com
In the paper, we consider novel scheduling problems under singlemachine, parallel-
machine and two-machine open-shop environment. The due date is assigned to a job …
machine and two-machine open-shop environment. The due date is assigned to a job …
Production scheduling considering outsourcing options and carrier costs
We consider a single‐machine scheduling problem with outsourcing options in an
environment where the cost information of the downstream is available via some information …
environment where the cost information of the downstream is available via some information …
A just-in-time scheduling problem with generalized due dates and controllable processing times
We consider a scheduling problem on identical machines in parallel such that the due date
is assigned not to the specific job, but to the job position. Each processing time can be …
is assigned not to the specific job, but to the job position. Each processing time can be …
A Just-in-time Single-machine Scheduling Problem with Convex Resource Consumption Functions, Generalized Due Dates and Rejection
BC Choi - 한국SCM 학회지, 2023 - dbpia.co.kr
We consider two just-in-time scheduling problems in a single-machine environment, where
the due dates are not job-dependent but position-dependent. A job can be rejected or …
the due dates are not job-dependent but position-dependent. A job can be rejected or …