A two-stage stochastic programming approach to employee scheduling in retail outlets with uncertain demand
This paper describes an employee scheduling system for retail outlets; it is a constraint-
based system that exploits forecasts and stochastic techniques to generate schedules …
based system that exploits forecasts and stochastic techniques to generate schedules …
The impact of dynamic learning and training on the personnel staffing decision
T Borgonjon, B Maenhout - Computers & Industrial Engineering, 2024 - Elsevier
This paper studies the personnel staffing decision accounting for the planning of workforce
training and the inclusion of learning and forgetting, which dynamically change the …
training and the inclusion of learning and forgetting, which dynamically change the …
Staff task-based shift scheduling solution with an ANP and goal programming method in a natural gas combined cycle power plant
Shift scheduling problems (SSPs) are advanced NP-hard problems which are generally
evaluated with integer programming. This study presents an applicable shift schedule of …
evaluated with integer programming. This study presents an applicable shift schedule of …
Developing two heuristic algorithms with metaheuristic algorithms to improve solutions of optimization problems with soft and hard constraints: An application to nurse …
PS Chen, ZY Zeng - Applied Soft Computing, 2020 - Elsevier
Many researchers have studied optimization problems with soft and hard constraints, such
as school timetabling, nurse rostering, vehicle routing with soft time window, and …
as school timetabling, nurse rostering, vehicle routing with soft time window, and …
Multi-objective missile boat scheduling problem using an integrated approach of NSGA-II, MOEAD, and data envelopment analysis
CC Chiu, CM Lai - Applied Soft Computing, 2022 - Elsevier
During peacetime, the missile boat squadron possesses rapidly deployable capacities for
crisis response. The squadron conducts maritime reconnaissance and patrolling …
crisis response. The squadron conducts maritime reconnaissance and patrolling …
A genetic algorithm for the personnel task rescheduling problem with time preemption
T Borgonjon, B Maenhout - Expert Systems with Applications, 2024 - Elsevier
In this paper, we study the personnel task rescheduling problem with time preemption. We
assume a baseline task schedule has been composed some time in advance that has been …
assume a baseline task schedule has been composed some time in advance that has been …
Solving the general employee scheduling problem
L Kletzander, N Musliu - Computers & Operations Research, 2020 - Elsevier
In many professions the demand for work requires employees to work in different shifts to
cover varying requirements including areas like health care, protection services …
cover varying requirements including areas like health care, protection services …
[HTML][HTML] Integrated task scheduling and personnel rostering of airports ground staff: A case study
In dealing with personnel management in companies, two fundamental planning issues
have to be handled: staff rostering and activities assignment. These two problems have …
have to be handled: staff rostering and activities assignment. These two problems have …
A shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirements
W Wang, K Xie, S Guo, W Li, F Xiao, Z Liang - European Journal of …, 2023 - Elsevier
Due to the computational complexity, the staff scheduling problem is generally decomposed
into two subproblems, ie staff rostering and task assignment problems. Very often, this could …
into two subproblems, ie staff rostering and task assignment problems. Very often, this could …
Heuristic decomposition approaches for an integrated task scheduling and personnel rostering problem
Real world combinatorial optimisation problems do not often reduce to neatly delineated
theoretical problems. Rather, they combine characteristics of various subproblems which …
theoretical problems. Rather, they combine characteristics of various subproblems which …