Fleet and revenue management in car rental companies: A literature review and an integrated conceptual framework

BB Oliveira, MA Carravilla, JF Oliveira - Omega, 2017 - Elsevier
This paper aims to present, define and structure the car rental fleet management problem,
which includes operational fleet management issues and problems traditionally studied …

Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming

M Nehring, E Topal, P Knights - Mining Technology, 2010 - journals.sagepub.com
Maximising value is the main objective when developing long term mine production
schedules. These results provide input for the development of a short term schedule that …

Push and rotate: a complete multi-agent pathfinding algorithm

B De Wilde, AW Ter Mors, C Witteveen - Journal of Artificial Intelligence …, 2014 - jair.org
Multi-agent Pathfinding is a relevant problem in a wide range of domains, for example in
robotics and video games research. Formally, the problem considers a graph consisting of …

BBUNS: Bluetooth beacon-based underground navigation system to support mine haulage operations

J Baek, Y Choi, C Lee, J Suh, S Lee - Minerals, 2017 - mdpi.com
A Bluetooth beacon-based underground navigation system (BBUNS) was developed to
identify the optimal haul road in an underground mine, track the locations of dump trucks …

Scheduling optimization of underground mine trackless transportation based on improved estimation of distribution algorithm

N Li, Y Wu, H Ye, L Wang, Q Wang, M Jia - Expert Systems with …, 2024 - Elsevier
The trend in underground mine development is trackless transportation, and the scheduling
optimization of underground mine trackless transportation is a current research hotspot. This …

[PDF][PDF] A practical approach to truck dispatch for open pit mines

RF Subtil, DM Silva, JC Alves - 35Th APCOM symposium, 2011 - academia.edu
According to the literature, material transportation represents 50 per cent of the operating
costs for an open pit mine. In this context, this paper proposes a multistage approach for …

Underground mine scheduling of mobile machines using constraint programming and large neighborhood search

M Åstrand, M Johansson, A Zanarini - Computers & Operations Research, 2020 - Elsevier
Manual short-term scheduling in underground mines is a time-consuming and error-prone
activity. In this work, we present a Constraint Programming approach capable of automating …

Measuring transport time of mine equipment in an underground mine using a bluetooth beacon system

J Jung, Y Choi - Minerals, 2016 - mdpi.com
In this study, the time taken for mine haulage equipment to travel between destinations in an
underground mine was measured and analyzed using a Bluetooth beacon system. In this …

Оцінка і вибір параметрів при розробці родовищ корисних копалин

АО Хорольський, ВГ Гріньов - Физико-технические …, 2020 - dspace.nbuv.gov.ua
Мета. Розробити новий підхід щодо ефективного освоєння родовищ корисних копалин
шляхом створення технології оптимального проектування. Методика. Для моделювання …

Intelligent scheduling for underground mobile mining equipment

Z Song, H Schunnesson, M Rinne, J Sturgul - PloS one, 2015 - journals.plos.org
Many studies have been carried out and many commercial software applications have been
developed to improve the performances of surface mining operations, especially for the …