Elevator group control system using genetic network programming with ACO considering transitions

L Yu, J Zhou, S Mabu, K Hirasawa… - SICE Annual …, 2007 - ieeexplore.ieee.org
Genetic programming network (GNP), a graph-based evolutionary method, has been
proposed as an extension of genetic algorithm (GA) and genetic programming (GP). The …

Double-deck elevator group supervisory control system using genetic network programming with ant colony optimization

L Yu, J Zhou, S Mabu, K Hirasawa… - 2007 IEEE Congress …, 2007 - ieeexplore.ieee.org
Recently, Artificial Intelligence (AI) technology has been applied to many applications. As an
extension of Genetic Algorithm (GA) and Genetic Programming (GP), Genetic Network …

Learning automata-based solutions to the single elevator problem

O Ghaleb, B John Oommen - IFIP International Conference on Artificial …, 2019 - Springer
The field of AI has been a topic of interest for the better part of a century, where the goal is to
have computers mimic human behaviour. Researchers have incorporated AI in different …

鲁棒优化与多智能体协调的电梯群控调度

宗群, 窦立谦, 刘文静, 王维佳 - 计算机集成制造系统, 2008 - cims-journal.cn
针对电梯群控调度过程中交通流不确定和优化求解复杂性的问题, 提出一种混合鲁棒优化方法和
多智能体协调的电梯群控调度方法. 分析了电梯群控调度中的交通流不确定问题 …

A double-Deck elevator group supervisory control system with destination floor guidance system using genetic network programming

L Yu, J Zhou, S Mabu, K Hirasawa, J Hu… - IEEJ Transactions on …, 2007 - jstage.jst.go.jp
A large number of modern elevators are installed in most skyscrapers. Elevator group
supervisory control system (EGSCS)(1) is the system where the elevator group supervisory …

Energy-consumption-related robust optimization scheduling strategy for elevator group control system

F Wang, J Tang, Q Zong - 2011 IEEE 5th International …, 2011 - ieeexplore.ieee.org
Group elevator scheduling (GES) problem is an optimization problem. In this work, a robust
optimization scheduling method is proposed to solve elevator group control system problem …

A branch and bound method to the continuous time model elevator system with full information

Z Shen, Q Zhao - SICE Journal of Control, Measurement, and …, 2008 - Taylor & Francis
A new Branch and Bound method is given for the scheduling of the group elevator system
with full information. Full information means that not only the parameters of the elevator …

An Elevator Dynamic Group Control Algorithm Based on Comprehensive Judgment of Time and Distance

Z Ouyang, H Ma, C Jiang, J Li - 2023 38th Youth Academic …, 2023 - ieeexplore.ieee.org
Economic progress has provided the necessary guarantee for the development of high-rise
buildings. Elevators, as a respected mode of transportation, play a key role in ordinary life …

[引用][C] 电梯群的可调整鲁棒优化调调度度

王芳, 宗群, 张景龙, 李俊芳 - 控制理论与应用, 2012

[引用][C] 电梯群控系统的一种鲁棒离散优化调度策略

宗群, 窦立谦, 王维佳 - 控制与决策, 2008