[HTML][HTML] Plug & abandonment of offshore wells: Ensuring long-term well integrity and cost-efficiency

T Vrålstad, A Saasen, E Fjær, T Øia, JD Ytrehus… - Journal of Petroleum …, 2019 - Elsevier
There is an upcoming" P&A wave" of wells that need to be permanently plugged and
abandoned, especially in mature, offshore areas such as the North Sea and Gulf of Mexico …

[HTML][HTML] Simulation of fluid flow through real microannuli geometries

AN Corina, R Skorpa, S Sangesland… - Journal of petroleum …, 2021 - Elsevier
Debonding of well cement towards casing or rock, ie microannuli formation, is a typical
failure mode of cement barriers. Consequently, such microannuli may act as leak paths …

Digital cement integrity: A methodology for 3D visualization of cracks and microannuli in well cement

T Vrålstad, R Skorpa - Sustainability, 2020 - mdpi.com
Leakages of greenhouse gases, such as methane and carbon dioxide from wells, may have
considerable environmental consequences. Although much emphasis is currently put on …

Well Integrity Flow Detection Using Novel Acoustic Pattern Recognition Algorithms

L Noble, T Langnes, P Thiruvenkatanathan… - Abu Dhabi …, 2020 - onepetro.org
This paper discusses a new technology that helps to identify and differentiate multiple
downhole well integrity events-tubing leaks, casing leaks, flow behind casing and …

[PDF][PDF] Long-term monitoring of decommissioned onshore gas wells

CR Huddlestone-Holmes, E Arjomand, J Kear - 2022 - gisera.csiro.au
At the end of their design life, petroleum wells are removed from production and
decommissioned. Decommissioning (also referred to as abandonment) is the point where a …

Leakage Through Micro-Annulus Geometries Incorporating Pressure-Driven Elastic Deformation

K Beltrán-Jiménez, HJ Skadsem, D Gardner… - Offshore Technology …, 2019 - onepetro.org
The cement between the casings and formation is a critical barrier element for ensuring
zonal isolation. Shrinkage during curing and mechanical or thermal loads applied during …

Time-to-failure estimation of barrier systems in permanently plugged and abandoned wells

Ø Arild, HP Lohne, HJ Skadsem… - International …, 2019 - asmedigitalcollection.asme.org
With the increasing number of aging fields and wells worldwide, a large number of wells will
have to permanently plugged and abandoned in the coming decades. Today's technical …

Assessment of a mature hydrocarbon field in SE Czech Republic for a CO2 storage pilot

V Hladik, V Opletal, R Berenblyum… - Proceedings of the …, 2022 - papers.ssrn.com
Preparation and execution of a CO2 storage pilot project is one of the first logical steps in the
effort to kick-start CCS in the region of Central & Eastern Europe, utilizing onshore …

Assessing Flow Potential Risk in Shallow Zones

R Piazza, P Netto, AP Grell, L Fernandes… - SPE Annual Technical …, 2024 - onepetro.org
Maintaining integrity is a major concern throughout the lifecycle of a well, especially during
the decommissioning stage. Regulatory requirements mandate that barriers be established …

Comparative Analysis of Permanent P & A Requirements and Consequences in Terms of Leakage-A Case Study

K Beltrán-Jiménez, HP Lohne, EP Ford… - Offshore Technology …, 2019 - onepetro.org
Abstract In South America, the discussion regarding permanent plug and abandonment
(P&A) at the end of the useful life of the fields is relatively recent, but it has become …