Efficient stochastic model for operational availability optimization of cooling tower using metaheuristic algorithms

A Kumar, M Saini, N Gupta, D Sinwar, D Singh… - IEEE …, 2022 - ieeexplore.ieee.org
Metaheuristic algorithms are extensively utilized to find solutions and optimize complex
industrial systems' performance. In this paper, metaheuristic algorithms are utilized to predict …

A new approach to determine maintenance periods of the most critical hydroelectric power plant equipment

M Bulut, E Özcan - Reliability Engineering & System Safety, 2021 - Elsevier
Power plants are large-scale generation facilities with high investment costs established to
ensure sustainable energy supply. Maintenance-Repair activities constitute the most critical …

Reliability modeling and availability analysis of combined cycle power plants

H Sabouhi, A Abbaspour, M Fotuhi-Firuzabad… - International Journal of …, 2016 - Elsevier
Power plant successful operation is always a function of its constituent sub-systems and
components. Due to the current financial constraints in power industry, power plant …

[PDF][PDF] Performance evaluation of a coal-fired power plant

R Kumar, AKR Sharma, PC Tewari - International Journal of …, 2013 - researchgate.net
This article presents the performance (availability) evaluation of a typical coalfired power
plant in a realistic working environment for identifying the critical sub-system and planning …

Effect of various pump hot-cold redundancy on availability of thermal power plant subsystems

R Kumar, AK Sharma… - International Journal of …, 2014 - inderscienceonline.com
The present paper deals with the effect of pump hot-cold redundancy on availability of
various subsystems in a thermal power plant. For analysis two subsystems of thermal power …

Operational availability optimization of cooling tower of thermal power plants using swarm intelligence-based metaheuristic algorithms

A Kumar, D Sinwar, VS Dhaka, SK Maakar - ICT Analysis and Applications …, 2022 - Springer
Cooling towers are mainly utilized to disperse the heat of thermal power plants (TPP). The
availability of cooling tower is directly proportional to the maximum availability of TPP. To …

Redundancy effect on coal-fired power plant availability

R Kumar - International Journal of Intelligent Enterprise, 2015 - inderscienceonline.com
The present study deals with the redundancy effect on operational availability of coal-fired
power plant for known failure and repair rates of each component or unit in the system. For …

Safety Assessment of Speed Governing Systems in Hydroelectric Power Plants: A Functional Safety Perspective

ÖT Kaymakçı, NM Balcı - Journal of Advanced Research in Natural …, 2023 - dergipark.org.tr
In line with the advancing technology, reliability has become one of the critical factors to be
taken into consideration by the operators in the energy sector to minimize losses regarding …

[PDF][PDF] Cascaded Fuzzy Controller Scheme For Combustion Control Of A Utility Boiler Using Control Balance Model

ASM Priyadharson, TR Rangaswamy - International Journal of …, 2011 - academia.edu
An innovative design for combustion control of utility boiler using control balance model
based cascaded fuzzy controller scheme is proposed. The existing control schemes have …

[PDF][PDF] RELIABILITY MODEL ASSORTMENT AND FAILURE PARAMETER GROUPING FOR MAINTENANCE ANALYSIS OF HYDRO POWER PLANTS: A REVIEW

S Chaturvedi, KK Jain - academia.edu
Hydro power generation is one of the most successful renewable energy resources for the
production electrical energy without any environmental hazard and presently it …