Overview and status of the Giant Magellan Telescope project

J Fanson, R Bernstein, G Angeli… - Ground-based and …, 2020 - spiedigitallibrary.org
The Giant Magellan Telescope project is proceeding with design, fabrication, and site
construction. The first two 8.4 m primary mirror segments have been completed and placed …

[HTML][HTML] Computational Fluid Dynamics-Based Systems Engineering for Ground-Based Astronomy

K Vogiatzis, G Angeli, G Trancho, R Conan - Computation, 2024 - mdpi.com
This paper presents the state-of-the-art techniques employed in aerothermal modeling to
respond to the current observatory design challenges, particularly those of the next …

GMT integrated FEM and its role in systems engineering

C Dribusch, R Conan, R Romano… - … for Astronomy XI, 2024 - spiedigitallibrary.org
The Giant Magellan Telescope Project relies heavily on integrated modeling (IM) to validate
various high-level performance requirements and operating conditions of its subsystems …

Characterization of the Dome Seeing of the Giant Magellan Telescope with Computational Fluid Dynamics Simulations

R Conan, K Vogiatzis, H Fitzpatrick - Propagation Through and …, 2024 - opg.optica.org
The image quality of ground based telescopes is limited by atmospheric turbulence. The
turbulence inside the dome of the telescopes, or dome seeing, accounts for a significant …

Key performance parameter thresholds for the Giant Magellan Telescope

BN Sitarski, GZ Angeli, S Gajadhar… - … for Astronomy X, 2022 - spiedigitallibrary.org
The Giant Magellan Telescope project established Key Performance Parameters (KPPs) for
measuring, tracking, and managing the evolution of expected observatory performance …

Integrated modeling based performance mode compliance analysis for the Giant Magellan Telescope

R Conan, B Sitarski, G Angeli… - … for Astronomy X, 2022 - spiedigitallibrary.org
The scientific performances of the Giant Magellan Telescope (GMT) Observatory are divided
into Observatory Performance Mode (OPM) formally defined in the GMT Observatory …

Key performance parameter based systems engineering for the Giant Magellan Telescope through construction and commissioning

GZ Angeli, B Sitarski, R Conan, B Walls… - … for Astronomy IX, 2020 - spiedigitallibrary.org
In the advanced design, construction, and commissioning phases of GMTO project, the
critical role of systems engineering is tracking and managing expected observatory …

Aerothermal modeling for ground-based observatories: Present and future

K Vogiatzis, G Angeli, G Trancho… - … for Astronomy IX, 2020 - spiedigitallibrary.org
This paper presents the state-of-the-art techniques employed in aerothermal modeling to
respond to the current observatory design challenges, and in particular those of the US …

The GMT site, enclosure, and facilities: 2020 design and construction update

B Bigelow, G Arriagada, R Turner… - Ground-based and …, 2020 - spiedigitallibrary.org
The Giant Magellan Telescope (GMT), one of three next-generation extremely large
telescopes (ELTs), will have a 25.4-meter diameter effective aperture, and will be located on …

The GMT site, enclosure, and facilities: 2024 design and construction update

B Bigelow, G Arriagada, C Madden… - Ground-based and …, 2024 - spiedigitallibrary.org
The Giant Magellan Telescope (GMT), one of three extremely large telescopes (ELTs) in
development, will be located on the summit of Cerro Las Campanas, a peak within the …