[HTML][HTML] An updated survey of variants and extensions of the resource-constrained project scheduling problem

S Hartmann, D Briskorn - European Journal of operational research, 2022 - Elsevier
The resource-constrained project scheduling problem is to schedule activities subject to
precedence and resource constraints such that the makespan is minimized. It has become a …

[HTML][HTML] Resource-constrained multi-project scheduling problem: A survey

MG Sánchez, E Lalla-Ruiz, AF Gil, C Castro… - European Journal of …, 2023 - Elsevier
Project Management is becoming increasingly crucial in competitive environments such as
manufacturing and the service industries. The Resource-Constrained Multi-Project …

Resource-constrained multi-project scheduling: Priority rule performance revisited

TR Browning, AA Yassine - International Journal of Production Economics, 2010 - Elsevier
Managers of multiple projects with overly constrained resources face difficult decisions in
how to allocate resources to minimize the average delay per project or the time to complete …

Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer

JC Chen, YY Chen, TL Chen, YH Lin - Computers & Industrial Engineering, 2022 - Elsevier
This study addresses a resource-constrained multi-project scheduling and multi-skilled
workforce assignment problem for the large-scale equipment manufacturing industry. The …

Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning

RK Soman, M Molina-Solana - Automation in Construction, 2022 - Elsevier
Look-ahead planning is the stage in construction planning where information from diverse
sources is integrated and plans developed for the next six/eight weeks. Poor planning of …

Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints

PH Chen, SM Shahandashti - Automation in Construction, 2009 - Elsevier
Since scheduling of multiple projects is a complex and time-consuming task, a large number
of heuristic rules have been proposed by researchers for such problems. However, each of …

Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling

R Van Eynde, M Vanhoucke - Journal of Scheduling, 2020 - Springer
In this paper, we propose a new dataset for the resource-constrained multi-project
scheduling problem and evaluate the performance of multi-project extensions of the single …

Simulation-based multiagent approach for scheduling modular construction

H Taghaddos, U Hermann, S AbouRizk… - Journal of Computing …, 2014 - ascelibrary.org
Modular construction is a common practice for building industrial plants, particularly in the oil
sands region of Alberta, Canada. Each module is a project with its own activities and …

Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates

D Bredael, M Vanhoucke - European Journal of Operational Research, 2023 - Elsevier
This paper reviews a set of ten existing metaheuristic solution procedures for the resource-
constrained multi-project scheduling problem. Algorithmic implementations are constructed …

BIM-based 4D simulation to improve module manufacturing productivity for sustainable building projects

J Lee, J Kim - Sustainability, 2017 - mdpi.com
Modular construction methods, where products are manufactured beforehand in a factory
and then transported to the site for installation, are becoming increasingly popular for …